1101 Wheatley Ave
Austin, TX 78752 · Austin Independent School District
Pickle Elementary gets a mental health center and shade structures
Austin permits dated May 6, 2025, through June 19, 2026, cover improvements at Pickle Elementary, including a secure entry checkpoint, a classroom conversion into a mental health center with an office, and two shade structures. The classroom conversion is described as approximately 920 square feet.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jun 19, 2026
- Projects
- 10
- 10 filings
- Latest filing
- Jun 19, 2026
- since Aug 20, 2024
- Largest scope
- 871 sf
- Estimated cost
- $275K
- state registration
Where this project stands
FinaledPickle elementary - install two shade structures
- AppliedJun 11, 2026
- IssuedJun 19, 2026
- WorkJun '26 – Nov '26
- Final inspectionNov 9, 2026
Passed final inspection Nov 9, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
10 projectsPickle elementary - install two shade structures
Pickle elementary - install two shade structures
City of Austin permitBuilding PermitFinal- Record
- 2026-076226 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
City of Austin permitElectrical PermitFinal- Record
- 2026-029850 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
City of Austin permitMechanical PermitFinal- Record
- 2026-029850 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
Project consists of an existing classroom of approximately 920 sq ft to be converted into a mental health center with an office
City of Austin permitBuilding PermitFinal- Record
- 2026-029850 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
City of Austin permitMechanical PermitFinal- Record
- 2025-050192 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
City of Austin permitElectrical PermitFinal- Record
- 2025-050192 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
Enclosing existing entry corridor to create secure vestibule securing new checkpoint space to improve control over access tointerior of school addition of security hardware to new vestibulespace. aisd project
City of Austin permitBuilding PermitFinal- Record
- 2025-050192 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Creating a secure vestibule with new entry into reconfigured admin space. addition of security hardware to new vestibule space and reception area. — pickle elementary school
TDLR project registrationRenovation/AlterationProject Closed871 sq ft$275K est.- Project #
- TABS2024025855
- Tenant / owner
- Secure Vestibule At Pickle Elementary School
- Design firm
- Pro
- Contact
- Pro
Interior remodel to existing school. work to include interior renovation including heating and cooling improvements (unit and chilled water piping replacements) and ceiling renovation/replacement. exterior wall maintenance/improvements at tilt wall concrete
Interior remodel to existing school. work to include interior renovation including heating and cooling improvements (unit and chilled water piping replacements) and ceiling renovation/replacement. exterior wall maintenance/improvements at tilt wall concrete
City of Austin permitMechanical PermitFinal- Record
- 2021-115225 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing school. work to include interior renovation including heating and cooling improvements (unit and chilled water piping replacements) and ceiling renovation/replacement. exterior wall maintenance/improvements at tilt wall concrete
Interior remodel to existing school. work to include interior renovation including heating and cooling improvements (unit and chilled water piping replacements) and ceiling renovation/replacement. exterior wall maintenance/improvements at tilt wall concrete
City of Austin permitBuilding PermitFinal- Record
- 2021-115225 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 1101 Wheatley Ave
What is being built at 1101 Wheatley Ave?
Permits describe school improvements at Pickle Elementary: a secure entry checkpoint, a classroom converted into a mental health center with an office, and two shade structures. The classroom is approximately 920 square feet.
Is a mental health center planned at Pickle Elementary?
Yes. An Austin building permit dated April 21, 2026, describes converting an existing classroom of approximately 920 square feet into a mental health center with an office. Permit 2026-029850 BP is marked Final.
What changes are planned for Pickle Elementary's entrance?
Permits describe enclosing an existing entry corridor to create a secure vestibule and checkpoint, with security hardware. The building permit, 2025-050192 BP, is dated May 6, 2025, and marked Final.
Are shade structures being added at Pickle Elementary?
Yes. Austin permit 2026-076226 BP, dated June 19, 2026, describes installing two shade structures at Pickle Elementary and is marked Final.
What's happening at Pickle Elementary near Artivion 1200?
Permits for Pickle Elementary at 1101 Wheatley Ave describe a classroom conversion into a mental health center with an office, a secure entry checkpoint, and two shade structures. Artivion 1200 is listed nearby at 1200 E Anderson Lane.
When were permits filed for the Pickle Elementary improvements?
The records span May 6, 2025, to June 19, 2026. They include permits for the secure entry work in May and July 2025, the classroom conversion in April, May and June 2026, and the shade structures in June 2026.
Also being built nearby
All of 78752- 7608 Meador AveOct 1, 2026Install three-quarter emt rain tight conduit and fittings from main panel roughly 30 feet down the same wall to the factory supplied spa sub panel. make final connections. bear electric scope of work starts and stops from panel to panel · 88 m away
- 1101 Wheatley Avenue · Pickle Elementary SchoolFeb 5, 2026Aisd pickle elementary school renovations — renovation/alteration — renovate existing classrooms into a community room, mental health center with an office · 101 m away
- 7610 Meador AveNov 30, 2023Construct new driveway approach of 21 ft. driveway approach will serve for both the building. 1: 23-045396 bp & building. 2: 23-045397 bp per record set · 101 m away
- 7606 Blessing AveNov 15, 2023Repair service · 118 m away
- 7609 Providence AveApr 14, 2025Replacement of an existing water heater standard 40 gal natural gas change out · 122 m away
- 7614 Meador AveJan 24, 2025Upgrading the existing main home 100 amp service to a 200 amp service to be able to feed both. this is an overhead service and we will be feeding the back home underground · 132 m away
- 7610 Blessing AveSep 11, 2024Rebuild of damaged electrical service · 138 m away
- 7512 Providence AveApr 29, 2025Cap off water and waste water · 143 m away
- 7604 Providence AveJul 10, 2025Replace existing electrical service with a 200 amp meter can and electrical panel · 144 m away
- 7608 Providence AveMay 21, 2024Upgrade building. a & building. b to 150x2 · 161 m away
- 7610 Providence AveJul 22, 2024Expedited review: new 3/2.5 2 story res with attached carport · 163 m away
- 1114 Delmar AveMar 2, 2007St. john's village · 207 m away