111 E St Johns Ave
Austin, TX 78752
111 E St Johns Ave: 5 projects on record
City of Austin lists 5 filings across 5 projects at 111 E St Johns Ave, Austin, TX 78752 since November 28, 2023. The most recent, filed April 1, 2024, covers: “Express: replace water heater replace hvac system replace siding in back of home (2nd floor)”.
Compiled from City of Austin records · updated Apr 1, 2024
- Projects
- 5
- 5 filings
- Latest filing
- Apr 1, 2024
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsExpress: replace water heater replace hvac system replace siding in back of home (2nd floor)
Express: replace water heater replace hvac system replace siding in back of home (2nd floor)
City of Austin permitMechanical PermitFinal- Record
- 2024-038037 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace water heater replace hvac system replace siding in back of home (2nd floor)
Express: replace water heater replace hvac system replace siding in back of home (2nd floor)
City of Austin permitPlumbing PermitFinal- Record
- 2024-038037 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace water heater replace hvac system replace siding in back of home (2nd floor)
Express: replace water heater replace hvac system replace siding in back of home (2nd floor)
City of Austin permitBuilding PermitFinal- Record
- 2024-038037 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace siding in back of home (2nd floor) replace a/c unit revision: replace water heater
Express: replace siding in back of home (2nd floor) replace a/c unit revision: replace water heater
City of Austin permitBuilding PermitExpired- Record
- 2024-032377 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express replace 3 back windows (like for like)
Express replace 3 back windows (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2023-152291 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 111 E St Johns Ave
What is being built at 111 E St Johns Ave?
The latest filing (City of Austin permit 2024-038037 MP, April 1, 2024) covers express: replace water heater replace hvac system replace siding in back of home (2nd floor).
How many permits and filings does 111 E St Johns Ave have?
5 filings across 5 projects, from November 28, 2023 to April 1, 2024.
Is there other construction near 111 E St Johns Ave?
Yes. Nearby filings include 601 St Johns Ave (st. john's west, Jan 21, 2022); 105 E St Johns Ave (replace panel meter and riser on house, Mar 2, 2026); 204 E Lisa Dr (replacement of complete existing central heat and air system with or without duct work, Nov 13, 2025).
How do I get alerts for new permits at 111 E St Johns Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 601 St Johns AveJan 21, 2022St. john's west · 42 m away
- 105 E St Johns AveMar 2, 2026Replace panel meter and riser on house · 59 m away
- 204 E Lisa DrNov 13, 2025Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 7205 Eastcrest DrSep 11, 2026Replacement of complete existing central heat and air system with or without duct work 4 ton condenser change-out & 88k btus furnace change-out · 90 m away
- 203 E Lisa DrSep 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 90 m away
- 7206 Eastcrest DrMay 6, 2026Sewer line replacement of 50 feet we will need to conduct a camera inspection of the line. this will involve accessing the vent stack on the roof to identify the points where both sewer lines exit the building. once located we will proceed with excavation to reroute both lines that emerge from the house subsequently connecting them and extending to the city tap · 109 m away
- 100 W St Johns AveFeb 26, 2026Replacement of condenser only condenser and coil only · 109 m away
- 7202 Twin Crest DrMar 2, 2007Child, inc. --twin crest daycare · 118 m away
- 7209 Eastcrest DrJun 26, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.04 kw · 121 m away
- 209 E Lisa DrMay 21, 2025Replacement of an existing water heater · 122 m away
- 7010 Deborah DrOct 21, 202585 tunnel below the foundation to repair entire drain system. 35 trench to replace yard sewer. 3 access holes- front left right · 123 m away
- 100 W Lisa DrJan 24, 2024Install roof-mounted solar and energy storage system to existing residence · 129 m away