1519 Coronado Hills
Austin, TX 78752 · Austin ISD
Austin ISD plans renovations at Clifton Career Development School
Austin ISD registered a renovation project for Clifton Career Development School at 1519 Coronado Hills on March 4, 2025. The work includes two secured entry vestibules, updates to administration spaces, culinary and cosmetology education programs, and roof modifications. The TDLR registration lists 16,250 square feet and an applicant-estimated project cost of $7,967,919.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2025
- since Mar 4, 2025
- Largest scope
- 16,250 sf
- Estimated cost
- $8.0M
- state registration
Where this project stands
Finishing up · inspection nextClifton Career Development School Renovations
16,250 sq ft · $8.0M est.
- RegisteredMar 4, 2025
- Plan review
- ConstructionApr '25 – Apr '26
- Inspectednow
- Closed
Scheduled to finish Apr 17, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior remodel of an existing cte campus including two new secured entry vestibules, modifications to the administration spaces, new culinary/ dining and cosmetology education programs as well as roof modifications. — clifton career development school
TDLR project registrationRenovation/AlterationReview Complete16,250 sq ft$8.0M est.- Project #
- TABS2025013329
- Tenant / owner
- Clifton Career Development School Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1519 Coronado Hills
What is being built at 1519 Coronado Hills in Austin?
The project is a renovation of the existing Clifton Career Development School, including secured entry vestibules, administration-space modifications, culinary and cosmetology education programs, and roof work.
Is a new school being built at 1519 Coronado Hills?
The TDLR record describes renovations to an existing CTE campus, not a new school building. The project was registered on March 4, 2025.
When was the Clifton Career Development School renovation filed?
The project was registered with TDLR on March 4, 2025, under project number TABS2025013329.
How much will the Clifton Career Development School renovations cost?
The TDLR registration lists an applicant-estimated project cost of $7,967,919. This is an estimate, not a confirmed final cost.
How large is the Clifton Career Development School renovation?
The TDLR registration lists a project area of 16,250 square feet.
What is being renovated near St George Senior Housing on Coronado Hills?
Clifton Career Development School at 1519 Coronado Hills is slated for renovations. St George Senior Housing is listed nearby at 1443 Coronado Hills Dr.
Also being built nearby
All of 78752- 1519 Coronado Hills DrNov 19, 2025Eplan: commercial expedited review - [public project] interior remodel to existing cte campus including 2 new secured enty vestibules remodel admin space new culinary dining and cosmetology education programs and roof modifications. (33583 sq ft)
- 1510 Coronado Hills DrApr 21, 2026Upgrade 125a service to 200a · 15 m away
- 7301 Berkman DrFeb 12, 2025*partial demolition* interior remodel with partial fire repair to single-story sfr · 22 m away
- 7300 Berkman DrJun 3, 2025Tunnel under slab up to 40 to expose and replace all old cast iron sewer line. tunnel access will be on exterior wall in backyard · 34 m away
- 7300 Sevilla DrDec 17, 2024Replacement of an existing water heater install like/like wh · 75 m away
- 1443 Coronado Hills Dr · St George Senior Housing INCJul 28, 2026Renovations of existing apartment buildings including interior upgrades to improve accessibility within dwelling units. work includes replacement of interior finishes doors plumbing fixtures electrical fixtures and devices and hvac equipment. exterior work includes replacement of siding windows and doors. no additions changes to building footprint or changes to the exterior building design are proposed. (building 6) · 82 m away
- 1438 Coronado Hills DrFeb 16, 2024New installation of generator to existing office (concurrent review) · 87 m away
- 7400 Sevilla DrOct 17, 2025Express- relacing 10 windows · 102 m away
- 7402 Berkman DrApr 22, 2025Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 7303 Sevilla DrSep 9, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 7405 Berkman DrMar 3, 2025Replace all drain lines under slab for 3 baths kitchen & washer (no vent work) · 124 m away
- 7406 Berkman DrOct 30, 202590 tunnel below the foundation to replace entire drain system. 4 access holes- front back back right · 125 m away