1707 Shelbourne Dr
Austin, TX 78752
1707 Shelbourne Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1707 Shelbourne Dr, Austin, TX 78752. The most recent, filed May 14, 2024, covers: “Repipe sewer drain under slab”.
Compiled from City of Austin records · updated May 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2024
- since May 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepipe sewer drain under slab
- AppliedMay 13, 2024
- IssuedMay 14, 2024
- WorkMay '24 – Jun '24
- Final inspectionJun 10, 2024
Passed final inspection Jun 10, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepipe sewer drain under slab
Repipe sewer drain under slab
City of Austin permitPlumbing PermitFinal- Record
- 2024-059955 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1707 Shelbourne Dr
What is being built at 1707 Shelbourne Dr?
The latest filing (City of Austin permit 2024-059955 PP, May 14, 2024) covers repipe sewer drain under slab.
How many permits and filings does 1707 Shelbourne Dr have?
1 filing across 1 project, from May 14, 2024 to May 14, 2024.
Is there other construction near 1707 Shelbourne Dr?
Yes. Nearby filings include 1702 Shelbourne Dr (whole house tunnel and sewer yard line replacement, Nov 9, 2025); 1713 Pebble Brook Dr (replacement of complete existing central heat and air system with or without duct work, Nov 15, 2024); 1711 Pebble Brook Dr (replacement of complete existing central heat and air system with or without duct work, Apr 29, 2024).
How do I get alerts for new permits at 1707 Shelbourne Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 1702 Shelbourne DrNov 9, 2025Whole house tunnel and sewer yard line replacement · 83 m away
- 1713 Pebble Brook DrNov 15, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 1711 Pebble Brook DrApr 29, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 1715 Pebble Brook DrJan 30, 2024Interior remodel to existing bathroom and hallway garage conversion to create two new bedrooms · 97 m away
- 1716 Shelbourne DrOct 14, 202665 tunnel below the foundation to replace entire drain system. 2 access holes - front left · 100 m away
- 7402 Brookhollow DrApr 16, 202690 tunnel below the foundation to replace entire drain system and 35 trench yard sewer replace. 4 access holes - left front front right · 109 m away
- 7400 Glenhill RdMar 28, 2024Tunnel below the foundation to repair entire cast-iron drain lines · 109 m away
- 7308 Glenhill RdNov 10, 2025Construct new driveway approach of 20 ft · 117 m away
- 1719 Pebble Brook DrDec 12, 2023Existing meter can failed and needs replaced on an occupied structure · 122 m away
- 7305 Glenhill RdOct 28, 2026Single story single family home will undergo a whole house interior remodel. no impervious cover will be added or removed · 129 m away
- 7504 Brookhollow DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 7405 Barcelona DrJul 19, 2024Replacement of complete existing central heat and air system with or without duct work · 154 m away