200 W Huntland Dr
Austin, TX 78752
Central heating and air systems replaced at 200 W Huntland Dr
City of Austin permits indicate replacement of existing central heat and air systems at 200 W Huntland Dr, rather than a new building project. The permits were filed April 22, 2025 (2025-047340 MP) and July 29, 2025 (2025-088952 MP); both are marked final.
Summarized from City of Austin records · updated Jul 29, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 29, 2025
- since Apr 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work job does not include duct work
- AppliedJul 17, 2025
- IssuedJul 29, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 30, 2025
Passed final inspection Jul 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work job does not include duct work
Replacement of complete existing central heat and air system with or without duct work job does not include duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-088952 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-047340 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 200 W Huntland Dr
What is being built at 200 W Huntland Dr in Austin?
The City of Austin records describe replacements of existing central heat and air systems. They do not describe a new building.
Is there a new development at 200 W Huntland Dr?
The available permits cover mechanical work to replace existing heating and air systems, not a new development.
When were the permits filed for 200 W Huntland Dr?
The permits were filed April 22, 2025, and July 29, 2025. Their IDs are 2025-047340 MP and 2025-088952 MP.
Are the permits for 200 W Huntland Dr approved or complete?
Both City of Austin mechanical permits are marked final.
What is happening near Gevity Phase II at 104 E Highland Mall Blvd?
At 200 W Huntland Dr, about 203 meters away, City of Austin permits indicate replacement of existing central heat and air systems. Both permits are marked final.
Also being built nearby
All of 78752- 6704 Esther DrAug 23, 202460 tunnel below the foundation to replace entire cast iron drain lines. 3 access holes - 2 in back and 1 front · 103 m away
- 6708 Esther DrOct 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 104 m away
- 114 Huntland DrMar 2, 2007Author's cocktail lounge · 129 m away
- 114 E Huntland DrJul 13, 2026Replace existing sewer yard line from the building to the city tap · 129 m away
- 6701 Isabelle DrMar 18, 2026Per tx gas we need to relocate the house gas meter due to a leak on there gas line and remove the meter due to being under the deck covering the gas line and meter. we need to relocate to an open area with no windows and door openings · 131 m away
- 6714 Esther DrNov 6, 2024Emergency overhead service rebuild. arcing overhead wires and damaged electrical equipment. i will be replacing the existing rag riser with a metallic riser through the roof 2/0 cu conductors mast point of attachment 200 amp meter with bypass handle 200 amp main breaker panel whole home surge protection and grounding system · 137 m away
- 6801 Esther DrFeb 24, 2026Renovation of kitchen and living spaces replacement of exterior siding addition of front porch replacement of back porch · 140 m away
- 6703 Isabelle DrNov 26, 2024Tunnel to repair sewer line and replace water heater · 144 m away
- 6640 Isabelle DrAug 11, 2025Replacement of an existing water heater replace existing tankless water heater with a new one · 148 m away
- 6611 Airport BlvdJun 25, 2025Install a type 2 hood over bread oven not review required please contact omar perez plan reviewer · 156 m away
- 6800 Esther DrAug 31, 2026Install 12k carrier highwall mini-split system · 156 m away
- 6700 Isabelle DrOct 29, 202540 tunnel below the foundation to replace entire drain system · 156 m away