305 Brentwood St
Austin, TX 78752
305 Brentwood St: 1 project on record
City of Austin lists 1 filing across 1 project at 305 Brentwood St, Austin, TX 78752. The most recent, filed February 15, 2024, covers: “Rebuild electrical service. 200 amp overhead”.
Compiled from City of Austin records · updated Feb 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 15, 2024
- since Feb 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRebuild electrical service. 200 amp overhead
- AppliedFeb 13, 2024
- IssuedFeb 15, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 13, 2024
Passed final inspection Mar 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRebuild electrical service. 200 amp overhead
Rebuild electrical service. 200 amp overhead
City of Austin permitElectrical PermitFinal- Record
- 2024-018290 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 305 Brentwood St
What is being built at 305 Brentwood St?
The latest filing (City of Austin permit 2024-018290 EP, February 15, 2024) covers rebuild electrical service. 200 amp overhead.
How many permits and filings does 305 Brentwood St have?
1 filing across 1 project, from February 15, 2024 to February 15, 2024.
Is there other construction near 305 Brentwood St?
Yes. Nearby filings include 307 Brentwood St (replacement of complete existing central heat and air system with or without duct work, Jun 16, 2025); 308 Irma Dr (install evse, Oct 1, 2024); 304 Canion St (replacement of an existing water heater, Nov 11, 2026).
How do I get alerts for new permits at 305 Brentwood St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 307 Brentwood StJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 26 m away
- 308 Irma DrOct 1, 2024Install evse · 65 m away
- 304 Canion StNov 11, 2026Replacement of an existing water heater · 69 m away
- 306 Canion StNov 15, 2024Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 401 Irma DrMay 23, 2024Request to disconnect install a 125 amp main breaker to existing mdp meter can to remain · 110 m away
- 500 Irma DrApr 22, 2025Construct new driveway approach of 10 ft ***new plan shows the driveway is 10 ft which will be updated by dsd confirmation from dsd has been added in the attachment. ***do not final this permit until the new plan is being added by dsd*** ***no sidewalk inspection per bp · 113 m away
- 502 Irma DrSep 2, 2026Construct new driveway approach of 14.5 ft and curb/gutter of 25 lf · 134 m away
- 407 Irma DrMay 11, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 501 Irma DrMar 3, 2025Replacement of an existing water heater 40 gallon natural gas water heater change out · 147 m away
- 601 Brentwood StJul 6, 2026Replacement of complete existing central heat and air system with or without duct work erin ohalloran · 150 m away
- 400 Wilmes DrFeb 25, 2026Replace 30 of sewer line under home create two access point · 157 m away
- 6611 Airport BlvdJun 25, 2025Install a type 2 hood over bread oven not review required please contact omar perez plan reviewer · 160 m away