5802 Avenue G
Austin, TX 78752
Water service line replacement at 5802 Avenue G
A plumbing permit indicates that the water service line from the meter to the home at 5802 Avenue G is being replaced. The City of Austin permit was filed on December 30, 2025, and its status is Final.
Summarized from City of Austin records · updated Dec 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 30, 2025
- since Dec 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing water service line in the yard from meter to the home
- AppliedDec 26, 2025
- IssuedDec 30, 2025
- WorkDec '25 – Jul '26
- Final inspectionJul 20, 2026
Passed final inspection Jul 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacing water service line in the yard from meter to the home
Replacing water service line in the yard from meter to the home
City of Austin permitPlumbing PermitFinal- Record
- 2025-162267 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5802 Avenue G
What work is permitted at 5802 Avenue G?
A City of Austin plumbing permit covers replacing the water service line in the yard, from the meter to the home.
When was the plumbing permit for 5802 Avenue G filed?
The permit was filed on December 30, 2025.
What is the permit number for work at 5802 Avenue G?
The permit number is 2025-162267 PP.
Is the 5802 Avenue G permit final?
Yes. The City of Austin record lists the permit status as Final.
Is a new home being built at 5802 Avenue G?
The available permit describes replacement of a water service line to the home, not construction of a new home.
How much will the work at 5802 Avenue G cost?
The permit record does not provide a project cost.
Also being built nearby
All of 78752- 5800 Avenue GDec 19, 2024Install irrigation system · 18 m away
- 5803 Avenue GSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 5801 Avenue GFeb 11, 2026Replace sewer line in the yard · 44 m away
- 5805 Avenue GMay 23, 2024Replacement of an existing water heater · 45 m away
- 5715 Avenue FAug 6, 2026Install level 2 ev charger · 45 m away
- 5713 Avenue FMar 12, 2025Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 5807 Avenue GJul 24, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage vertical gas system · 54 m away
- 5715 Avenue GNov 18, 20261-story addition to existing single family residence. 3 bed/2 bath. interior remodel of existing · 70 m away
- 5708 Avenue GFeb 25, 2026Replacement of complete existing central heat and air system with or without duct work paul quinzi · 72 m away
- 5801 Avenue FJul 8, 2025(kroner veronica) - installation of circuit for elec. vehicle charging station - esip · 72 m away
- 5806 Duval StDec 28, 2023Gas pipe install for home generator · 88 m away
- 5706 Avenue FDec 22, 2023Express: replace door like for like replace asphalt shingles repair/replace soffit replace siding/trim repair/replacing decking boards (roof decking and back patio deck) · 95 m away