5931 Dillard Cir
Austin, TX 78752
Dillard Circle Highline site plans withdrawn and expired
Austin records show site-plan cases for Dillard Circle Highline at 5931 Dillard Cir, rather than a confirmed building project. The first case was filed January 8, 2024, and was withdrawn; a related case filed March 27, 2025, is listed as expired. The records do not specify the proposed project’s size or use.
Summarized from City of Austin records · updated Mar 27, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 27, 2025
- since Jan 8, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 5931 Dillard Cir
What is being built at 5931 Dillard Cir in Austin?
Austin records list site-plan cases named Dillard Circle Highline, but do not describe a specific building or use. The 2024 case was withdrawn, and the related 2025 case is expired.
Is construction planned at 5931 Dillard Cir?
The available records document site-plan cases, not confirmed construction. Case 12991272 was withdrawn, and case 13262322 is listed as expired.
What is the status of the Dillard Circle Highline project?
The City of Austin lists case 12991272, filed January 8, 2024, as withdrawn. Related case 13262322, filed March 27, 2025, is listed as expired.
When was Dillard Circle Highline permitted?
The records show site-plan filings on January 8, 2024, and March 27, 2025. They do not show an issued building permit.
What kind of project is Dillard Circle Highline?
The records identify it as a site-plan project but do not specify its intended use, size, or building details.
Also being built nearby
All of 78752- 6003-1/2 Dillard CirOct 7, 2016Dillard circle parking lot(with r spc-2015-0188d) · 42 m away
- 5925 Dillard CirSep 6, 2007Trinity hardwoods industrial · 88 m away
- 6015 Dillard CirMar 6, 2024Replacement of an existing water heater · 101 m away
- 205 E Skyview RdSep 17, 2025Request to disconnect installing 200 amp automatic transfer switch on the existing 200 amp main breaker for energy storage system · 113 m away
- 6012-1/2 Airport BlvdMay 23, 2016Highland infrastructure phase a · 124 m away
- 108 E Skyview RdJan 24, 2025Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 303 E Skyview RdMar 5, 2024Replace water line to repair leak · 135 m away
- 6001-1/2 Airport BlvdSep 11, 2019Fontaine plaza · 140 m away
- 305 E Skyview RdMar 21, 2024Tunnel front bathroom and install new sewerline to city tap · 149 m away
- 5815 Duval StJun 9, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 162 m away
- 5805 Avenue FOct 27, 2026Repairing water line from meter to home appox 5 ft · 166 m away
- 5807 Avenue GJul 24, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage vertical gas system · 177 m away