6102-1/8 Thomas Hatfield Way
Austin, TX 78752
6102-1/8 Thomas Hatfield Way: 1 project on record
City of Austin lists 1 filing across 1 project at 6102-1/8 Thomas Hatfield Way, Austin, TX 78752. The most recent, filed January 13, 2021, covers: “St. johns encampment commons”.
Compiled from City of Austin records · updated Jan 13, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2021
- since Jan 13, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6102-1/8 Thomas Hatfield Way
What is being built at 6102-1/8 Thomas Hatfield Way?
The latest filing (City of Austin case 12311866, January 13, 2021) covers st. johns encampment commons.
How many permits and filings does 6102-1/8 Thomas Hatfield Way have?
1 filing across 1 project, from January 13, 2021 to January 13, 2021.
What is being built near City Of Austin in Austin?
6102-1/8 Thomas Hatfield Way is about 80 m from City Of Austin (6310 Wilhelmina Delco Dr). Its latest filing is for st. johns encampment commons.
Is there other construction near 6102-1/8 Thomas Hatfield Way?
Yes. Nearby filings include 6310 Wilhelmina Delco Dr (community creative center — renovation/alteration — interior tenant finish-out of an existing cold, dark shell lease space. tenant work includes modification of existing storefront system, restrooms, lighting, hvac, and theater equipment, Apr 22, 2026); 6018 Wilhelmina Delco Dr (the addition of two vented lobby enclosures at level 7 beneath existing canopy roofs and glazed wind screens at five lower lobby levels. existing parking garage, Aug 11, 2026); 6200 Middle Fiskville Rd (midtown point (with r sp-2023-0516c), Mar 12, 2026).
How do I get alerts for new permits at 6102-1/8 Thomas Hatfield Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 6310 Wilhelmina Delco Dr · City Of AustinApr 22, 2026Community creative center — renovation/alteration — interior tenant finish-out of an existing cold, dark shell lease space. tenant work includes modification of existing storefront system, restrooms, lighting, hvac, and theater equipment · 80 m away
- 6018 Wilhelmina Delco Dr · Austin Community College DistrictAug 11, 2026The addition of two vented lobby enclosures at level 7 beneath existing canopy roofs and glazed wind screens at five lower lobby levels. existing parking garage · 82 m away
- 6200 Middle Fiskville RdMar 12, 2026Midtown point (with r sp-2023-0516c) · 115 m away
- 618 Highland Mall Blvd · Neil VickersNov 17, 2026Esp - the maven · 188 m away
- 523 Highland Mall BlvdApr 15, 2021Resubdivisiion of lot 3c amended plat of lots 3c and 3d resubdivision of lot 3e austin mall · 201 m away
- 604 E Highland Mall BlvdJan 26, 2024Cap off water/wastewater lines · 203 m away
- 604 Highland Mall BlvdApr 15, 2024604 e highland mall boulevard · 203 m away
- 803 Tirado StNov 17, 2025Repair to damaged gas line on exterior of building · 232 m away
- 6000 Middle Fiskville RdApr 2, 2025Repairing 30 of clay sewer pipe in parking lot · 261 m away
- 645-1/2 Clayton LnSep 20, 2024Highland south greenway · 267 m away
- 6406 IH 35 SvrdSep 4, 2025Stout house @ the linc cocktail lounge cup · 295 m away
- 6401 Jonathan DrJan 8, 2024Acc-highland campus future north parking garage · 297 m away