7006 Twin Crest Dr
Austin, TX 78752
7006 Twin Crest Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7006 Twin Crest Dr, Austin, TX 78752 since May 31, 2024. The most recent, filed December 31, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 31, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 31, 2024
- since May 31, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 19, 2024
- IssuedDec 31, 2024
- WorkDec '24 – Jan '25
- Final inspectionJan 14, 2025
Passed final inspection Jan 14, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-165520 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade zinsco service panel with new 150a main breaker panel and 200a ae meter socket
Upgrade zinsco service panel with new 150a main breaker panel and 200a ae meter socket
City of Austin permitElectrical PermitFinal- Record
- 2024-065139 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7006 Twin Crest Dr
What is being built at 7006 Twin Crest Dr?
The latest filing (City of Austin permit 2024-165520 MP, December 31, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7006 Twin Crest Dr have?
2 filings across 2 projects, from May 31, 2024 to December 31, 2024.
Is there other construction near 7006 Twin Crest Dr?
Yes. Nearby filings include 7005 Twin Crest Dr (replacement of complete existing central heat and air system with or without duct work, Jun 18, 2024); 7011 Twin Crest Dr (interior remodel removed wall between living room and kitchen remodel of interior all bathroom and kitchen fixtures will not be relocated (currently have express for interior work but removed a wall in the process), May 8, 2024); 211 E Lisa Dr (replacement of complete existing central heat and air system with or without duct work, Aug 21, 2025).
How do I get alerts for new permits at 7006 Twin Crest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7005 Twin Crest DrJun 18, 2024Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 7011 Twin Crest DrMay 8, 2024Interior remodel removed wall between living room and kitchen remodel of interior all bathroom and kitchen fixtures will not be relocated (currently have express for interior work but removed a wall in the process) · 61 m away
- 211 E Lisa DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 7001 Twin Crest DrMar 1, 2026Tunnel approx 20ft to replumb cast iron drain system up to bottom of foundation and out to exterior cleanout · 73 m away
- 209 E Lisa DrMay 21, 2025Replacement of an existing water heater · 80 m away
- 6909 Twin Crest DrJul 23, 2024Construct new walkway of 4 lf from back of curb to row line · 90 m away
- 7004 Deborah DrJun 22, 2026Express- replace 9 windows with new windows of the same size; like for like install · 91 m away
- 6911 Deborah DrAug 13, 2026Base: installing a backup battery system and additional meter socket · 92 m away
- 7002 Deborah DrJan 23, 2024Replacement of an existing water heater · 95 m away
- 7010 Deborah DrOct 21, 202585 tunnel below the foundation to repair entire drain system. 35 trench to replace yard sewer. 3 access holes- front left right · 95 m away
- 6908 Twin Crest DrOct 22, 2026Repiping sewer under slab · 100 m away
- 6909 Deborah DrAug 15, 2025Sewer line repair under the foundation of the home replacing cast iron piping with pvc roughly 100ft · 110 m away