7313 N Lamar Blvd
Austin, TX 78752
Demolition permit covers eight structures at 7313 N Lamar Blvd
A City of Austin permit covers demolition of eight structures dating to around 1963 at 7313 N Lamar Blvd. The building permit, 2024-039870 BP, was filed April 3, 2024; a plumbing permit for a cap-off was filed April 25, 2024. These records do not identify new construction at the site.
Summarized from City of Austin records · updated Apr 25, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 25, 2024
- since Apr 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCap off
- AppliedMar 21, 2024
- IssuedApr 25, 2024
- WorkApr '24 – May '24
- Final inspectionMay 8, 2024
Passed final inspection May 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCap off
Cap off
City of Austin permitPlumbing PermitFinal- Record
- 2024-042591 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Demolition of (8) structures circa 1963 2024 010233 da - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Demolition of (8) structures circa 1963 2024 010233 da - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2024-039870 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7313 N Lamar Blvd
What is being built at 7313 N Lamar Blvd?
The available City of Austin permits document demolition of eight structures and a plumbing cap-off, not a new building. The demolition permit was filed April 3, 2024.
Is 7313 N Lamar Blvd being demolished?
A City of Austin building permit, 2024-039870 BP, covers demolition of eight structures dating to around 1963. The permit was filed April 3, 2024, and is listed as final.
When was the demolition permit for 7313 N Lamar Blvd filed?
Permit 2024-039870 BP was filed April 3, 2024. Its description says the buildings could not be demolished until the contractor fulfilled neighbor-notification requirements.
What does the plumbing permit at 7313 N Lamar Blvd cover?
Permit 2024-042591 PP is described as “Cap off.” The City of Austin filed it April 25, 2024, and lists it as final.
What is being demolished near Maad Lamb Cuisine on North Lamar?
At 7313 N Lamar Blvd, about 201 meters from Maad Lamb Cuisine, a City of Austin permit covers demolition of eight structures dating to around 1963. The permit was filed April 3, 2024.
Also being built nearby
All of 78752- 7301 Lamar BlvdJun 5, 20267301 n lamar multifamily · 60 m away
- 7301 N Lamar BlvdMay 18, 2026New construction of in-ground swimming pool associated with 2023-140336 pr · 60 m away
- 7209 N Lamar BlvdApr 25, 2024Cap off water and wastewater · 98 m away
- 7401 N Lamar BlvdFeb 2, 2026Emergency service call on a occupied home. interior of main disconnect was burned out replace like for like · 99 m away
- 7401 Lamar BlvdJan 21, 20227401 lamar llc · 99 m away
- 801 Sugaree AveJan 13, 2024Emergency gas line repair for apartment complex · 123 m away
- 624 W O Dell StFeb 15, 2024Emergency repair and upgrade of 150amp to 200map. ae disconnected service due to unsafe conditions · 127 m away
- 7200 Lamar BlvdSep 26, 2018Crestview station · 160 m away
- 700 W St Johns AveFeb 17, 2026Gas test - there is no gas on to the home · 165 m away
- 621 W O Dell StOct 2, 2024Replacement of complete existing central heat and air system with or without duct work · 167 m away
- 707 W Crestland DrDec 2, 2025Interior remodel - the exterior siding insulation and interior sheetrock will be renewed/replace. the affected area is limited to one side of the house (the north side) two new transom windows will be installed to this side. new cabinetry will be installed in the kitchen. no changes will be made to the tile flooring and no plumbing changes. a licensed electrician will rewire the entire house and install a new service panel · 170 m away
- 618 W O Dell StJun 7, 2024Express foundation repair installing 12 cmu · 172 m away
More demolitions in 78752.