7409 Berkman Dr
Austin, TX 78752
7409 Berkman Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7409 Berkman Dr, Austin, TX 78752. The most recent, filed December 1, 2023, covers: “Tunnel under house to replace cast iron”.
Compiled from City of Austin records · updated Dec 1, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 1, 2023
- since Dec 1, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under house to replace cast iron
- AppliedNov 2, 2023
- IssuedDec 1, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 12, 2023
Passed final inspection Dec 12, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under house to replace cast iron
Tunnel under house to replace cast iron
City of Austin permitPlumbing PermitFinal- Record
- 2023-142122 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7409 Berkman Dr
What is being built at 7409 Berkman Dr?
The latest filing (City of Austin permit 2023-142122 PP, December 1, 2023) covers tunnel under house to replace cast iron.
How many permits and filings does 7409 Berkman Dr have?
1 filing across 1 project, from December 1, 2023 to December 1, 2023.
Is there other construction near 7409 Berkman Dr?
Yes. Nearby filings include 7405 Berkman Dr (replace all drain lines under slab for 3 baths kitchen & washer (no vent work), Mar 3, 2025); 7406 Berkman Dr (90 tunnel below the foundation to replace entire drain system. 4 access holes- front back back right, Oct 30, 2025); 7402 Berkman Dr (replacement of complete existing central heat and air system with or without duct work, Apr 22, 2025).
How do I get alerts for new permits at 7409 Berkman Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7405 Berkman DrMar 3, 2025Replace all drain lines under slab for 3 baths kitchen & washer (no vent work) · 4 m away
- 7406 Berkman DrOct 30, 202590 tunnel below the foundation to replace entire drain system. 4 access holes- front back back right · 13 m away
- 7402 Berkman DrApr 22, 2025Replacement of complete existing central heat and air system with or without duct work · 14 m away
- 7400 Sevilla DrOct 17, 2025Express- relacing 10 windows · 79 m away
- 7502 Sevilla DrAug 11, 2025Install new 7.11kw rooftop solar system to existing residential only using line side tap · 85 m away
- 7503 Berkman DrNov 6, 2026Upgrade electrical service · 97 m away
- 7504 Berkman DrFeb 1, 2024Replacing exterior electrical 200 amp service panel · 100 m away
- 7504 Sevilla DrSep 17, 2024Replacement of an existing water heater · 100 m away
- 7506 Berkman DrJun 4, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 7407 Sevilla DrApr 3, 2024Express: window replacement (like for like) siding replacement tub-to-shower conversion · 105 m away
- 7300 Berkman DrJun 3, 2025Tunnel under slab up to 40 to expose and replace all old cast iron sewer line. tunnel access will be on exterior wall in backyard · 110 m away
- 7301 Berkman DrFeb 12, 2025*partial demolition* interior remodel with partial fire repair to single-story sfr · 112 m away