7409 Brookhollow Dr
Austin, TX 78752
7409 Brookhollow Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 7409 Brookhollow Dr, Austin, TX 78752. The most recent, filed November 18, 2026, covers: “Installed tankless water heater”.
Compiled from City of Austin records · updated Nov 18, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstalled tankless water heater
- AppliedMar 4, 2021
- IssuedNov 18, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
4 projectsInstalled tankless water heater
Installed tankless water heater
City of Austin permitPlumbing PermitActive- Record
- 2021-031330 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add 60 amp circuit and install 48a ev charger to residence
Add 60 amp circuit and install 48a ev charger to residence
City of Austin permitElectrical PermitFinal- Record
- 2024-107513 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Schedule disconnect/reconnect with austin energy and upgrade electrical service to 200 amps
Schedule disconnect/reconnect with austin energy and upgrade electrical service to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2024-103495 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 9.625kw rooftop solar system to new residential only
Install new 9.625kw rooftop solar system to new residential only
City of Austin permitElectrical PermitFinal- Record
- 2023-043842 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7409 Brookhollow Dr
What is being built at 7409 Brookhollow Dr?
The latest filing (City of Austin permit 2021-031330 PP, November 18, 2026) covers installed tankless water heater.
How many permits and filings does 7409 Brookhollow Dr have?
4 filings across 4 projects, from November 18, 2026 to November 18, 2026.
Is there other construction near 7409 Brookhollow Dr?
Yes. Nearby filings include 7508 Hemingway (express - remodel 2 bathrooms replace tub toilet cabinets mirrors and lighting fixtures. replace kitchen counter and paint cabinets. floor plan remains the same, Mar 23, 2026); 7402 Brookhollow Dr (90 tunnel below the foundation to replace entire drain system and 35 trench yard sewer replace. 4 access holes - left front front right, Apr 16, 2026); 1716 Shelbourne Dr (65 tunnel below the foundation to replace entire drain system. 2 access holes - front left, Oct 14, 2026).
How do I get alerts for new permits at 7409 Brookhollow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7508 HemingwayMar 23, 2026Express - remodel 2 bathrooms replace tub toilet cabinets mirrors and lighting fixtures. replace kitchen counter and paint cabinets. floor plan remains the same · 40 m away
- 7402 Brookhollow DrApr 16, 202690 tunnel below the foundation to replace entire drain system and 35 trench yard sewer replace. 4 access holes - left front front right · 74 m away
- 1716 Shelbourne DrOct 14, 202665 tunnel below the foundation to replace entire drain system. 2 access holes - front left · 74 m away
- 7520 HemingwayJun 18, 2024Disconnect for waterheater · 78 m away
- 2003 Millay DrMar 13, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 7504 Brookhollow DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 7522 HemingwayJul 31, 2026Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 1719 Pebble Brook DrDec 12, 2023Existing meter can failed and needs replaced on an occupied structure · 100 m away
- 7509 Brookhollow DrApr 30, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 2009 Millay DrAug 26, 2026Express- remove and replace 8 windows like for like no structural changes · 104 m away
- 7600 HemingwayAug 14, 20264 ton heat pump condenser change-out & 88k btus air handler change-out · 125 m away
- 2101 Kippling DrJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 128 m away