7524 Meadowview Ln
Austin, TX 78752
7524 Meadowview Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 7524 Meadowview Ln, Austin, TX 78752. The most recent, filed September 5, 2024, covers: “Replace/install 125 amp main panel & meter base (overhead)”.
Compiled from City of Austin records · updated Sep 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2024
- since Sep 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace/install 125 amp main panel & meter base (overhead)
- AppliedAug 29, 2024
- IssuedSep 5, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 13, 2024
Passed final inspection Sep 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace/install 125 amp main panel & meter base (overhead)
Replace/install 125 amp main panel & meter base (overhead)
City of Austin permitElectrical PermitFinal- Record
- 2024-110897 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7524 Meadowview Ln
What is being built at 7524 Meadowview Ln?
The latest filing (City of Austin permit 2024-110897 EP, September 5, 2024) covers replace/install 125 amp main panel & meter base (overhead).
How many permits and filings does 7524 Meadowview Ln have?
1 filing across 1 project, from September 5, 2024 to September 5, 2024.
Is there other construction near 7524 Meadowview Ln?
Yes. Nearby filings include 7522 Meadowview Ln (replacement of complete existing central heat and air system with or without duct work, Dec 8, 2025); 7526 Meadowview Ln (40 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - 1 right 1 back, Oct 22, 2024); 7521 Meadowview Ln (installation of ev charging station, Apr 29, 2026).
How do I get alerts for new permits at 7524 Meadowview Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7522 Meadowview LnDec 8, 2025Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 7526 Meadowview LnOct 22, 202440 tunnel below the foundation to replace entire cast iron drain system. 2 access holes - 1 right 1 back · 25 m away
- 7521 Meadowview LnApr 29, 2026Installation of ev charging station · 46 m away
- 7523 Meadowview LnAug 11, 2026Replace natural gas water heater · 53 m away
- 7523 Delafield LnOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 7603 Meadowview LnNov 20, 2024Replacement of an existing water heater · 100 m away
- 7515 Delafield LnFeb 6, 2025Replace the sanitary sewer yard line · 100 m away
- 7603 Delafield LnAug 11, 202650 tunnel below the foundation to replace entire drain system. 3 access holes - back back right · 102 m away
- 7518 Northcrest BlvdJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 7522 Delafield LnMar 21, 2024Replacement of an existing water heater · 110 m away
- 7516 Northcrest BlvdNov 24, 2025Expedited review - new construction of a 2-story secondary apartment [2bed 2bath] · 110 m away
- 7514 Northcrest BlvdJul 17, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton gas system · 116 m away