1015 Weeping Willow Dr
Austin, TX 78753
1015 Weeping Willow Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1015 Weeping Willow Dr, Austin, TX 78753. The most recent, filed December 4, 2023, covers: “Solar panel installation: there will be a additional upgrade permit with this address”.
Compiled from City of Austin records · updated Dec 4, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 4, 2023
- since Dec 4, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSolar panel installation: there will be a additional upgrade permit with this address
- AppliedNov 30, 2023
- IssuedDec 4, 2023
- WorkDec '23 – May '24
- Final inspectionMay 21, 2024
Passed final inspection May 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsSolar panel installation: there will be a additional upgrade permit with this address
Solar panel installation: there will be a additional upgrade permit with this address
City of Austin permitElectrical PermitFinal- Record
- 2023-153488 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request for disconnect this is for an electrical upgrade to accompany an aux permit so we can do the electrical upgrade for a solar panel installation. we will need a disconnection and reconnection with this permit
Request for disconnect this is for an electrical upgrade to accompany an aux permit so we can do the electrical upgrade for a solar panel installation. we will need a disconnection and reconnection with this permit
City of Austin permitElectrical PermitFinal- Record
- 2023-153511 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1015 Weeping Willow Dr
What is being built at 1015 Weeping Willow Dr?
The latest filing (City of Austin permit 2023-153488 EP, December 4, 2023) covers solar panel installation: there will be a additional upgrade permit with this address.
How many permits and filings does 1015 Weeping Willow Dr have?
2 filings across 2 projects, from December 4, 2023 to December 4, 2023.
Is there other construction near 1015 Weeping Willow Dr?
Yes. Nearby filings include 1013 Weeping Willow Dr (new 1-story 1 bedroom 1 bathroom secondary dwelling unit with covered front porch, Jun 24, 2024); 1011 Weeping Willow Dr (replacement of an existing water heater, Sep 12, 2025); 8412 Danville Dr (replacement of an existing water heater, May 8, 2024).
How do I get alerts for new permits at 1015 Weeping Willow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1013 Weeping Willow DrJun 24, 2024New 1-story 1 bedroom 1 bathroom secondary dwelling unit with covered front porch · 19 m away
- 1011 Weeping Willow DrSep 12, 2025Replacement of an existing water heater · 43 m away
- 8412 Danville DrMay 8, 2024Replacement of an existing water heater · 70 m away
- 1039 Wisteria TrlOct 9, 2026Base: installing a backup battery system and additional meter socket · 75 m away
- 1013 Durham DrMay 27, 2025Express - foundation repair · 91 m away
- 8408 Danville DrOct 16, 2025Install ev charger circuit and ev charger · 110 m away
- 1036 Wisteria TrlSep 30, 2026Replacement of complete existing central heat and air system with or without duct work woodhall · 127 m away
- 8412 Furness DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 1034 Wisteria TrlNov 22, 2024New install for existing residential home · 131 m away
- 1101 Durham DrMar 28, 2024Replace water heater · 137 m away
- 8602 Furness DrJul 17, 2026Replacement of an existing water heater replacement of ng water heater like for like · 139 m away
- 1032 Wisteria TrlFeb 27, 2025Interior remodel removing interior non-load bearing wall and moving stove and sink with pony wall opening concrete with wet saw will reinforce with dowells and epoxy with high performance psi load concrete · 140 m away
More solar installs in 78753.