102 E Rundberg Ln
Austin, TX 78753 · Austin Independent School District
1,500-square-foot portable planned at Guerrero Thompson Elementary
A new 1,500-square-foot portable with a ramp and landing is planned at Guerrero Thompson Elementary School, according to a TDLR registration filed June 1, 2026. Austin issued a building permit for the portable on June 17, and later permits cover shade structures. The TDLR registration lists the applicant’s estimated project cost as $200,000.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Sep 3, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Sep 3, 2026
- since Dec 21, 2023
- Largest scope
- 1,500 sf
- Estimated cost
- $200K
- state registration
Where this project stands
Permit active · work underwayInstall shade structures. 2025-012454 da
- AppliedAug 28, 2026
- IssuedSep 3, 2026
- WorkSep '26 – May '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
13 projectsInstall shade structures. 2025-012454 da
Install shade structures. 2025-012454 da
City of Austin permitBuilding PermitActive- Record
- 2026-114150 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New portable and flatwork. 2026 067974 da - approved
New portable and flatwork. 2026 067974 da - approved
City of Austin permitMechanical PermitFinal- Record
- 2026-074237 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New portable and flatwork. 2026 067974 da - approved
New portable and flatwork. 2026 067974 da - approved
City of Austin permitElectrical PermitFinal- Record
- 2026-074237 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New portable and flatwork. 2026 067974 da - approved
New portable and flatwork. 2026 067974 da - approved
City of Austin permitPlumbing PermitFinal- Record
- 2026-074237 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New portable and flatwork. 2026 067974 da - approved
New portable and flatwork. 2026 067974 da - approved
City of Austin permitBuilding PermitActive- Record
- 2026-074237 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install shade structures
Install shade structures
City of Austin permitBuilding PermitFinal- Record
- 2026-071317 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New portable with ramp and landing. — guerrero thompson elementary school
TDLR project registrationRenovation/AlterationInspection Complete1,500 sq ft$200K est.- Project #
- TABS2026021598
- Tenant / owner
- Guerrero Thompson - Portable
- Design firm
- Pro
- Contact
- Pro
Addition of security hardware and ballistic film to existing vesibule
Addition of security hardware and ballistic film to existing vesibule
City of Austin permitElectrical PermitFinal- Record
- 2024-005465 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition of security hardware and ballistic film to existing vesibule
Addition of security hardware and ballistic film to existing vesibule
City of Austin permitBuilding PermitFinal- Record
- 2024-005465 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
City of Austin permitElectrical PermitFinal- Record
- 2023-147455 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
City of Austin permitMechanical PermitFinal- Record
- 2023-147455 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2023-147455 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
Replacement of two existing air-cooled chillers replacement of one existing rtu-2.3 flush clean treat chilled water closed loop bas controls upgrades related to the air-cooled chillers and rtu 2.3 (like for like)
City of Austin permitPlumbing PermitFinal- Record
- 2023-147455 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 102 E Rundberg Ln
What is being built at 102 E Rundberg Ln?
Records describe a new 1,500-square-foot portable with a ramp and landing at Guerrero Thompson Elementary School. City permits also cover shade structures.
When was the portable at 102 E Rundberg Ln permitted?
The TDLR project registration was filed June 1, 2026. Austin’s building permit, 2026-074237 BP, is dated June 17, 2026, and is listed as active.
How large is the new portable at Guerrero Thompson Elementary?
The TDLR registration lists the portable project at 1,500 square feet.
Are shade structures being installed at 102 E Rundberg Ln?
Yes. Austin records show a shade-structure building permit dated June 5, 2026, listed as final, and another dated September 3, 2026, listed as active.
What is the estimated cost of the Guerrero Thompson portable project?
The TDLR registration lists an applicant estimate of $200,000 for the project. This is an estimate, not a confirmed final cost.
What other permits were filed for the portable at 102 E Rundberg Ln?
Austin records show mechanical, electrical, and plumbing permits tied to the new portable and flatwork. They are dated July 17, July 6, and June 24, 2026, respectively, and each is listed as final.
Also being built nearby
All of 78753- 102 E Rundberg Lane · Austin Independent School DistrictJan 9, 2024Secure vestibule at guerrero thompson elementary school — renovation/alteration — addition of new secure vestibule at main entrance of school
- 102 Rundberg LnAug 10, 2012Aisd north central elementary school no. 1 · 18 m away
- 204 Rundberg LnNov 16, 2026Rundberg multifamily · 86 m away
- 9306 Georgian DrMar 2, 2022Georgian acres subdivision re-sub of remainder of lot 6, blk 'k' (with r of c8-2018-0063.0a) · 102 m away
- 9307 Slayton DrMay 13, 2025Rebuild outdated electrical service · 102 m away
- 305 Rundberg LnMar 18, 2019Rundberg plaza · 141 m away
- 9209 Slayton DrDec 12, 2023New accessory structure consisting of a carport with studio above containing a full bathroom accessed by an exterior wood staircase · 157 m away
- 9300 Slayton Drive · Austin ISDJan 18, 2025Barrington elementary school — new construction — new 2-story elementary school · 162 m away
- 9300 Slayton DrMar 27, 2026Aisd - barrington es · 175 m away
- 9209 North DrMar 18, 2026Electrical service upgrade and feeder conduit installation from approved 3-meter bank to existing residence at 9209 north dr. work associated with approved espa for property containing three dwellings · 184 m away
- 306 Rundberg LnMar 2, 2007Northchase apartments drainage improvements · 208 m away
- 9201 Slayton DrMar 17, 2025Express: fire damage in one of the rooms due to wires overheating those cables are needed to be replaced as well as the main and sub electrical panel new insulation and sheetrock is needed to be installed for the walls and roof of this room its approx 400 ft of sheetrock · 218 m away