11305 Oakwood Dr
Austin, TX 78753
Plumbing tunnel permitted at 11305 Oakwood Dr
A plumbing permit covers a tunnel to expose the front bathroom plumbing group at 11305 Oakwood Dr, starting at the two-way cleanout. The City of Austin issued permit 2025-156307 PP on December 12, 2025; the permit status is Final.
Summarized from City of Austin records · updated Dec 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 12, 2025
- since Dec 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel to expose front bathroom group from the front of the house starting at the 2 way cleanout
- AppliedDec 9, 2025
- IssuedDec 12, 2025
- WorkDec '25 – Mar '26
- Final inspectionMar 17, 2026
Passed final inspection Mar 17, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel to expose front bathroom group from the front of the house starting at the 2 way cleanout
Tunnel to expose front bathroom group from the front of the house starting at the 2 way cleanout
City of Austin permitPlumbing PermitFinal- Record
- 2025-156307 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11305 Oakwood Dr
What work is permitted at 11305 Oakwood Dr?
The permit describes a tunnel to expose the front bathroom plumbing group, starting at the two-way cleanout.
Is a new home being built at 11305 Oakwood Dr?
The available City of Austin record is for plumbing work at a house, not a new-home construction permit.
When was the plumbing permit filed for 11305 Oakwood Dr?
The City of Austin permit was filed on December 12, 2025.
What is the permit number for work at 11305 Oakwood Dr?
The permit number is 2025-156307 PP.
Is the 11305 Oakwood Dr plumbing permit final?
Yes. The City of Austin record lists permit 2025-156307 PP as Final.
Also being built nearby
All of 78753- 11303 Oakwood DrAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 26 m away
- 11307 Oakwood DrAug 21, 2026Tunnel job to replace up to 25ft of drain line and a section of outside sewer line · 27 m away
- 11301 Oakwood DrJun 18, 2026Repair plumbing underneath bathroom after tunnel is dug to expose the plumbing pipes underneath the home · 52 m away
- 11300 Oakwood DrOct 7, 2026Upgrade service to units 1 &2 new riser meters and panels and grounding · 79 m away
- 11303 Indianhead DrFeb 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 104 m away
- 201 Braker LnMar 2, 2007Austex body & frame building & site improvements · 114 m away
- 11309 Indianhead DrMar 27, 2025Replace service panel like for like. old one is obsolete and a fire danger due to the brand · 117 m away
- 11300 Indianhead DrJun 12, 2026Upgrade electrical service for duplex a&b unit · 162 m away
- 11405 Indianhead DrDec 12, 2024Tunnel sewer line repair under foundation of the home roughly18ft total(2-9ft sections) replacing the damaged drain system from 2 toilets using pvc · 174 m away
- 405 Braker LnDec 27, 2007Dollar general-braker · 181 m away
- 101 Braker LnNov 3, 2016Pioneer crossing east section 3a · 182 m away
- 110 Farley DrMar 2, 2007Lamar body shop · 195 m away