11508 Oakwood Dr
Austin, TX 78753
50-gallon gas water heater replacement at 11508 Oakwood Dr
A 50-gallon gas water heater replacement was permitted at 11508 Oakwood Dr in Austin on February 9, 2026. The City of Austin permit, 2026-014389 PP, is marked final.
Summarized from City of Austin records · updated Feb 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 9, 2026
- since Feb 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 50-gallon gas water heater replacement
- AppliedFeb 6, 2026
- IssuedFeb 9, 2026
- WorkFeb '26 – Feb '26
- Final inspectionFeb 25, 2026
Passed final inspection Feb 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater 50-gallon gas water heater replacement
Replacement of an existing water heater 50-gallon gas water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2026-014389 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11508 Oakwood Dr
What work was permitted at 11508 Oakwood Dr?
The City of Austin issued a plumbing permit for replacement of an existing 50-gallon gas water heater. The permit is 2026-014389 PP, dated February 9, 2026.
Is a new home being built at 11508 Oakwood Dr?
The record is for replacing an existing water heater, not for building a new home. The permit is marked final.
When was the water heater replacement permitted?
The City of Austin permit was filed on February 9, 2026. Its permit number is 2026-014389 PP.
Is the permit for 11508 Oakwood Dr final?
Yes. The City of Austin record for the 50-gallon gas water heater replacement lists the permit status as final.
How much is the 11508 Oakwood Dr project expected to cost?
The available permit record does not report a project cost or valuation.
Also being built nearby
All of 78753- 11506 Oakwood DrJun 26, 2024Express: shower remodel revision: re-do tub/shower combo at guest bathroom install 2 exhaust fans on master and guest bathroom · 28 m away
- 11509 Indianhead DrApr 24, 2026Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 11509 Oakwood DrDec 3, 2024We are going to replace the main water line running from the house to the meter · 62 m away
- 11514 Oakwood DrMar 7, 2025Home builders loop ref: 2024-097986 bp · 77 m away
- 11502 Oakwood DrJul 11, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas system · 85 m away
- 101 E Covington DrFeb 6, 2025Service rebuild 200amp: this will be meter riser panel and grounding (overhead) · 85 m away
- 11515 Oakwood DrMar 8, 2018Lots 6 & 7 block 1 eubank access sec 2 amended · 91 m away
- 11502 Indianhead DrNov 6, 2024Replace gas line from meter to house · 105 m away
- 11411 Oakwood DrFeb 17, 2026Plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole(s) at the __main cleanout in the backyard ____ of the house. - then we will tunnel underneath the foundation of the house approximately __50___ feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided · 118 m away
- 102 E Covington DrAug 11, 2026Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 11508 White Wing AveMay 22, 2026Replace 100-amp main breaker panel · 127 m away
- 11506 White Wing AveJun 24, 2025Tunnel underneath house to repair drain line at bottom restroom. 1 access hole around perimeter · 140 m away