12007 Lamar Blvd
Austin, TX 78753
12007 Lamar Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 12007 Lamar Blvd, Austin, TX 78753. The most recent, filed March 2, 2007, covers: “On the green villas”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 12007 Lamar Blvd
What is being built at 12007 Lamar Blvd?
The latest filing (City of Austin case 189468, March 2, 2007) covers on the green villas.
How many permits and filings does 12007 Lamar Blvd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 12007 Lamar Blvd?
Yes. Nearby filings include 12007 N Lamar Blvd (replacement of complete existing central heat and air system with or without duct work, Oct 30, 2026); 12030 Lamar Blvd (la palma plaza(withdrawal & resubmit of sp-2012-0353c), Dec 23, 2014); 11902 Oakbrook Dr (tunnel to replace cast iron drain system additionally we will crush and abandon septic and connect to city tap location, Jan 12, 2024).
How do I get alerts for new permits at 12007 Lamar Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 12007 N Lamar BlvdOct 30, 2026Replacement of complete existing central heat and air system with or without duct work
- 12030 Lamar BlvdDec 23, 2014La palma plaza(withdrawal & resubmit of sp-2012-0353c) · 121 m away
- 11902 Oakbrook DrJan 12, 2024Tunnel to replace cast iron drain system additionally we will crush and abandon septic and connect to city tap location · 158 m away
- 11912 Lamar BlvdJan 21, 2022North austin muslim community center parking lot · 174 m away
- 11914 Oakbrook DrOct 29, 2024200 amp service upgrade · 210 m away
- 11908 N Lamar BlvdJan 29, 2026Gas testing for leaks · 226 m away
- 11908 Lamar BlvdSep 4, 2026Brentwood christian school expansion site plan (with r sp-2023-0509c) · 226 m away
- 11904 Glenda CtMay 5, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 240 m away
- 11902 Conann CtJan 16, 2026Change out the electrical meter and panel. upgrade · 269 m away
- 12062 N Lamar BlvdNov 18, 2026Replacement of sewer line in yard · 276 m away
- 11920 Oakbrook DrJul 2, 2024Installation of 7.82kw solar pv and 27kwh energy storage system to residence · 282 m away
- 11911 Tedford StMar 11, 2026Kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft · 310 m away