12800 Center Lake Dr
Austin, TX 78753
Existing HVAC systems being replaced at 12800 Center Lake Dr
Three City of Austin mechanical permits filed June 9 and July 16, 2026, describe replacement of the complete existing central heating and air system, with or without duct work. All three permits are marked Final. A site plan case for Bella Sarah was approved and released in 2007.
Summarized from City of Austin records · updated Jul 16, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jul 16, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled***timed virtual inspection: 08/17/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work
- AppliedJul 3, 2026
- IssuedJul 16, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 17, 2026
Passed final inspection Aug 17, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projects***timed virtual inspection: 08/17/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work
***timed virtual inspection: 08/17/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-085496 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-071984 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-065752 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12800 Center Lake Dr
What is being done at 12800 Center Lake Dr in Austin?
City permits describe replacement of the existing central heating and air system, with or without duct work. The permits were filed June 9 and July 16, 2026, and are marked Final.
Is a new building being built at 12800 Center Lake Dr?
The recent permits describe replacement of existing heating and air equipment, not construction of a new building.
When were permits filed for work at 12800 Center Lake Dr?
The City of Austin filed mechanical permits 2026-071984 MP and 2026-065752 MP on June 9, 2026, and permit 2026-085496 MP on July 16, 2026.
What's happening near Einstein Bagel on Center Lake Drive?
At 12800 Center Lake Dr, about 90 meters from the Einstein Bagel address listed at 12705 Center Lake Dr, City permits describe replacement of the existing central heating and air system.
What was approved at 12800 Center Lake Dr in 2007?
A City of Austin site plan case named Bella Sarah was approved and released on March 2, 2007.
Also being built nearby
All of 78753- 12705 Center Lake Dr · Reg Atx 214 W Parmer Lane, LtdOct 5, 2026*secondary contractor* we will be installing the walk in cooler · 90 m away
- 13001 Center Lake DrMay 27, 2026Hws 45746 sign a - install front-lit channel letters on east elevation homewood suites by hilton · 200 m away
- 13100 Center Lake DrAug 28, 2024Installation of pallet racks for existing warehouse - unit 100 · 350 m away
- 500 Canyon Ridge DrNov 10, 2026Upgrades to the refrigerated display cases gondola shelving and end caps. relocations at various department within the store with some mep modification · 369 m away
- 221 E. Parmer Lane · Qt South, LLCNov 12, 2025Quiktrip # 4142 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. project 300sf · 373 m away
- 13301 Center Lake DrSep 18, 2026Tech ridge section 1 · 375 m away
- 12625 IH 35 SvrdSep 2, 2022Tech ridge mixed use · 388 m away
- 13300 Center Lake Dr · Centerstate 99, Ltd.Nov 9, 2026Eplan: commercial expedited review - new construction of a 3-story multi-family building. (25297 sq ft) · 413 m away
- 12510 Mc Callen PassMar 2, 2007Center park modular office building · 436 m away
- 221 Parmer LnFeb 27, 2020Quiktrip no 4142 (with r sp-2017-0507c) · 450 m away
- 12601 Mc Callen PassFeb 17, 2009Parmer south subdivision, a resubdivision of metrotech section one, metrotech se — parmer south subdivision, a resubdivision of metrotech section one, metrotech section two, the crossing at parmer lane section one, the crossing at parmer lane section two · 453 m away
- 12504 Mc Callen PassJul 31, 2014Tech ridge phase iii resubdivision of lot 7, 8 and 9tech ridge phase iii resubdi · 469 m away