12829 Parmer Ridge Dr
Austin, TX 78753
Office build-outs and a mechanical yard at Parmer Ridge
Austin permits indicate office finish-outs for Building 2, Units 100 and 200, along with a new mechanical equipment yard at 12829 Parmer Ridge Drive. Building permits for the office work were filed September 19, 2025; separate permits for the equipment yard were filed June 22, 2026. An electrical permit for illuminated channel letters was filed October 29, 2026.
Summarized from City of Austin records · updated Oct 29, 2026
- Projects
- 17
- 17 filings
- Latest filing
- Oct 29, 2026
- since May 27, 2022
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayNew illuminated channel letters on backer panel
- AppliedOct 28, 2026
- IssuedOct 29, 2026
- WorkOct '26 – Apr '27
- Final inspection
Permit & project history
17 projectsNew illuminated channel letters on backer panel
New illuminated channel letters on backer panel
City of Austin permitElectrical PermitActive- Record
- 2026-141893 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review: new construction mechanical equipment yard. this scope was previously under 2025-116801 bp and 2025-116801 ep. ae requires that it be split off due to addressing issues with electrical meters on site
Eplan review: new construction mechanical equipment yard. this scope was previously under 2025-116801 bp and 2025-116801 ep. ae requires that it be split off due to addressing issues with electrical meters on site
City of Austin permitElectrical PermitActive- Record
- 2026-074988 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review: new construction mechanical equipment yard. this scope was previously under 2025-116801 bp and 2025-116801 ep. ae requires that it be split off due to addressing issues with electrical meters on site
Eplan review: new construction mechanical equipment yard. this scope was previously under 2025-116801 bp and 2025-116801 ep. ae requires that it be split off due to addressing issues with electrical meters on site
City of Austin permitBuilding PermitActive- Record
- 2026-074983 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review tenant finish-out to create office space building 2 unit 100 msb1 building hvac 2000amp ct job metered at transformer
Eplan review tenant finish-out to create office space building 2 unit 100 msb1 building hvac 2000amp ct job metered at transformer
City of Austin permitElectrical PermitActive- Record
- 2025-116801 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review tenant finish-out to create office for building 2 unit 200 msb2 unit 200 3000amp ct job metered at transformer
Eplan review tenant finish-out to create office for building 2 unit 200 msb2 unit 200 3000amp ct job metered at transformer
City of Austin permitElectrical PermitActive- Record
- 2025-116802 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review tenant finish-out to create office space building 2 unit 100
Eplan review tenant finish-out to create office space building 2 unit 100
City of Austin permitPlumbing PermitFinal- Record
- 2025-116801 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review tenant finish-out to create office for building 2 unit 200
Eplan review tenant finish-out to create office for building 2 unit 200
City of Austin permitMechanical PermitActive- Record
- 2025-116802 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review: tenant finish-out to create office space building 2 unit 100
Eplan review: tenant finish-out to create office space building 2 unit 100
City of Austin permitBuilding PermitActive- Record
- 2025-116801 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan review tenant finish-out to create office for building 2 unit 200
Eplan review tenant finish-out to create office for building 2 unit 200
City of Austin permitBuilding PermitActive- Record
- 2025-116802 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Finish out to create office/lab (ut innovation lab) eplan review
Finish out to create office/lab (ut innovation lab) eplan review
City of Austin permitPlumbing PermitFinal- Record
- 2024-125870 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Finish out to create office/lab (ut innovation lab) eplan review
Finish out to create office/lab (ut innovation lab) eplan review
City of Austin permitMechanical PermitFinal- Record
- 2024-125870 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Finish out to create office/lab (ut innovation lab) eplan review
Finish out to create office/lab (ut innovation lab) eplan review
City of Austin permitElectrical PermitFinal- Record
- 2024-125870 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Finish out to create office/lab (ut innovation lab) eplan review
Finish out to create office/lab (ut innovation lab) eplan review
City of Austin permitBuilding PermitFinal- Record
- 2024-125870 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12829 Parmer Ridge Dr
What is being built at 12829 Parmer Ridge Drive?
Austin permits describe office finish-outs in Building 2, Units 100 and 200, and a new mechanical equipment yard. The office building permits, 2025-116801 BP and 2025-116802 BP, were filed September 19, 2025.
When were permits filed for the office work at 12829 Parmer Ridge Drive?
The building permits for office finish-outs in Building 2, Units 100 and 200 were filed September 19, 2025. Related plumbing, mechanical, and electrical permits followed.
Is a mechanical equipment yard planned at Parmer Ridge Drive?
Austin filed building permit 2026-074983 BP and electrical permit 2026-074988 EP for a new construction mechanical equipment yard on June 22, 2026. The permit descriptions say this scope was split from earlier permits because of addressing issues with electrical meters.
What is going in near Dell PS2-3 Executive Area Refresh?
At 12829 Parmer Ridge Drive, about 452 meters from the Dell PS2-3 Executive Area Refresh listing, Austin permits describe office finish-outs in Building 2 and a new mechanical equipment yard. The records do not identify an office tenant.
Are new signs being installed at 12829 Parmer Ridge Drive?
An Austin electrical permit filed October 29, 2026, describes new illuminated channel letters on a backer panel. Permit 2026-141893 EP is listed as active.
What are the office permits for Building 2, Units 100 and 200?
Permits 2025-116801 BP and 2025-116802 BP cover tenant finish-outs to create office space in Units 100 and 200. Both building permits were filed September 19, 2025, and are listed as active.
Also being built nearby
All of 78753- 791 E Parmer LnDec 20, 2024Dell ps3b ocs-p — renovation/alteration — mep systems upgrade, new server racks, hot aisle containment. construction of a new exterior mep equipment yard in parking lot. interior scope includes converting a portion of the existing mezzanine level to mechanical equipment space · 173 m away
- 724-1/2 Parmer LnNov 21, 2021Resubdivision of parmer business park lot 9 preliminary plan · 216 m away
- 12931 Parmer Ridge DrAug 19, 2020Parmer sector 5 · 299 m away
- 13000 Harris Ridge BlvdNov 12, 2025Popstroke - monument · 323 m away
- 717 Parmer LnSep 14, 2022717 parmer · 324 m away
- 13001 Harris Ridge BlvdDec 8, 2025Install new 200 amp 3 phase service for retention pond · 347 m away
- 900 Parmer LnDec 23, 2025Parmer village lot1a (with r sp-2017-0197c) · 387 m away
- 500 Parmer LnJan 21, 2022Parmer north infrastructure · 389 m away
- 701 E Parmer Ln · Dell Usa LPNov 13, 2026Dell ps3-1 csc 2.0 — renovation/alteration — installation of new server equipment, limited exterior work, demolition raised access flooring, construction of new floors, finishes and mep and limited landscaping · 452 m away
- 701 East Parmer LaneApr 8, 2024Ps3-2 go big — renovation/alteration — new partitions, fixtures, furniture, and electrical work · 452 m away
- 301 E Parmer LnSep 17, 2026Commercial reroof. remove existing roofing system and install new gaf tpo roofing system · 452 m away
- 701 E. Parmer Lane · Dell Usa LPMar 11, 2026Dell ps2-3 executive area refresh — renovation/alteration — interior renovation of existing office and break room on level 3 · 452 m away
More offices in 78753.