12908 Latchwood Ln
Austin, TX 78753
12908 Latchwood Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12908 Latchwood Ln, Austin, TX 78753. The most recent, filed December 11, 2024, covers: “Express: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)”.
Compiled from City of Austin records · updated Dec 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 11, 2024
- since Dec 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)
- AppliedDec 11, 2024
- IssuedDec 11, 2024
- WorkDec '24 – Dec '24
- Final inspectionDec 26, 2024
Passed final inspection Dec 26, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExpress: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)
Express: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)
City of Austin permitPlumbing PermitFinal- Record
- 2024-161809 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)
Express: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2024-161809 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12908 Latchwood Ln
What is being built at 12908 Latchwood Ln?
The latest filing (City of Austin permit 2024-161809 PP, December 11, 2024) covers express: replace tub / shower with acrylic shower base and walls replace valves and fixtures (like for like).
How many permits and filings does 12908 Latchwood Ln have?
2 filings across 2 projects, from December 11, 2024 to December 11, 2024.
Is there other construction near 12908 Latchwood Ln?
Yes. Nearby filings include 12920 Latchwood Ln (replacement of complete existing central heat and air system with or without duct work 4 ton vertical two-stage electric heat pump system, Feb 24, 2025); 12921 Latchwood Ln (replacement of complete existing central heat and air system with or without duct work, Jan 17, 2025); 12928 Latchwood Ln (express- foundation repair. install 16 total pilings, Feb 4, 2026).
How do I get alerts for new permits at 12908 Latchwood Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 12920 Latchwood LnFeb 24, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton vertical two-stage electric heat pump system · 54 m away
- 12921 Latchwood LnJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 12928 Latchwood LnFeb 4, 2026Express- foundation repair. install 16 total pilings · 90 m away
- 1325 Dexford DrNov 25, 2025Express: replace hall bathroom tub and tile · 120 m away
- 1427 Dexford DrJun 14, 2012Harris glen commons amenity · 122 m away
- 12937 Latchwood LnApr 15, 2026Replacement of complete existing central heat and air system with or without duct work replacing a 5 ton with a like for like · 134 m away
- 1317 Dexford DrFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 12940 Latchwood LnFeb 28, 2024Replacement of an existing water heater · 149 m away
- 12941 Latchwood LnMar 20, 2026Express: foundation repair (install 10 push piers) · 151 m away
- 12810 Blaine RdOct 6, 2025Replacement of an existing water heater wh swap out. 1 for 1 · 181 m away
- 12724 Blaine RdApr 29, 2026Express- foundation repair · 191 m away
- 12829 Serafy CtJul 23, 2025Express: foundation repair as per scope of work attached · 194 m away