40-foot main water line permitted at 1306 Byers Ln
A 40-foot main water line is being installed at 1306 Byers Ln in Austin. The City of Austin issued plumbing permit 2026-131184 PP on October 8, 2026; its status is Final.
Summarized from City of Austin records · updated Oct 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2026
- since Oct 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling a 40 ft main water line
- AppliedOct 6, 2026
- IssuedOct 8, 2026
- WorkOct '26 – Oct '26
- Final inspectionOct 15, 2026
Passed final inspection Oct 15, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstalling a 40 ft main water line
Installing a 40 ft main water line
City of Austin permitPlumbing PermitFinal- Record
- 2026-131184 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1306 Byers Ln
What is being built at 1306 Byers Ln?
A City of Austin permit describes installation of a 40-foot main water line at the address.
When was the water line permitted at 1306 Byers Ln?
The City of Austin permit was filed on October 8, 2026.
What is the permit number for work at 1306 Byers Ln?
The plumbing permit number is 2026-131184 PP.
Is the 1306 Byers Ln water line permit approved?
The permit record lists its status as Final.
How long is the water line planned for 1306 Byers Ln?
The permit description specifies a 40-foot main water line.
Also being built nearby
All of 78753- 11912 Shropshire BlvdJul 24, 2025Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 1314 Byers LnDec 19, 2024Austin energy pulled the meter from this rental property and the owner is setting up the electrical utility account in his name going forward. needs a final electrical inspection and weve identified that we need to add main a disconnecting means install a ground rod to tie it into the service and install conduit over existing exposed wiring before a final inspection can be performed · 66 m away
- 11826 Tobler TrlMay 28, 2024My customer wants to upgrade his electrical main service he have some issues with the actual electrical service due that the main breaker trips often. this service will be overhead and we will be replacing the branch breaker for the same kind · 88 m away
- 1313 Byers LnSep 22, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 89 m away
- 11837 Shropshire BlvdJun 5, 2024Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 11816 Tobler TrlAug 28, 2025Replacement of an existing water heater · 116 m away
- 1308 Deupree DrJan 28, 2026Express: foundation repair · 118 m away
- 11830 Shropshire BlvdJun 11, 2024Replacement of an existing water heater · 120 m away
- 11814 Tobler TrlNov 14, 2024Install an ev charger and doing a main panel upgrade to accomodate charger 60amp · 127 m away
- 1404 Byers LnJul 23, 2025Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 11909 Tobler TrlAug 14, 2024Express: foundation repair- installing 9 exterior pilings · 134 m away
- 11828 Shropshire BlvdMar 9, 2026Replacement of complete existing central heat and air system with or without duct work · 135 m away