EV charger installation permitted at 13115 Fieldgate Dr

An electrical permit filed February 4, 2026, covers installation of a hardwired GM Power Shift EV charger at 13115 Fieldgate Dr in Austin. The permit describes a 60-amp circuit with the charger drawing up to 48 amps; its status is Final.

Summarized from City of Austin records · updated Feb 4, 2026

Projects
1
1 filings
Latest filing
Feb 4, 2026
since Feb 4, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Ev charger installation... run ev circuit from exterior 200-amp main panel on rear right-side wall. install surface mounted conduit along exterior right-side none wall and enter garage route conductors to front interior right side garage wall left of irrigation controls and hardwired gm power shift charger the charger will be installed on a 60-amp circuit and will draw up to 48 continuous

  1. AppliedFeb 3, 2026
  2. IssuedFeb 4, 2026
  3. WorkFeb '26 – Apr '26
  4. Final inspectionApr 10, 2026

Passed final inspection Apr 10, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Ev charger installation... run ev circuit from exterior 200-amp main panel on rear right-side wall. install surface mounted conduit along exterior right-side none wall and enter garage route conductors to front interior right side garage wall left of irrigation controls and hardwired gm power shift charger the charger will be installed on a 60-amp circuit and will draw up to 48 continuous

    Ev charger installation... run ev circuit from exterior 200-amp main panel on rear right-side wall. install surface mounted conduit along exterior right-side none wall and enter garage route conductors to front interior right side garage wall left of irrigation controls and hardwired gm power shift charger the charger will be installed on a 60-amp circuit and will draw up to 48 continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 13115 Fieldgate Dr

What is being installed at 13115 Fieldgate Dr?

A City of Austin electrical permit covers installation of a hardwired GM Power Shift EV charger. It describes a 60-amp circuit, with the charger drawing up to 48 amps.

When was the EV charger permit filed at 13115 Fieldgate Dr?

The permit was filed on February 4, 2026. Its number is 2026-013182 EP.

Is the permit for an EV charger at 13115 Fieldgate Dr final?

Yes. The City of Austin permit record lists status as Final.

What kind of electrical work is planned at 13115 Fieldgate Dr?

The permit describes running an EV circuit from the exterior 200-amp main panel to a hardwired charger in the garage. It specifies a 60-amp circuit.

How much power will the charger at 13115 Fieldgate Dr draw?

The permit says the charger will draw up to 48 amps continuously on a 60-amp circuit.