City of Austin lists 1 filing across 1 project at 1312 Rutherford Ln, Austin, TX 78753. The most recent, filed March 2, 2007, covers: “Cameron electrical substation”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1312 Rutherford Ln
What is being built at 1312 Rutherford Ln?
The latest filing (City of Austin case 149823, March 2, 2007) covers cameron electrical substation.
How many permits and filings does 1312 Rutherford Ln have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near Pc1 in Austin?
1312 Rutherford Ln is about 163 m from Pc1 (1404 Park Center Drive). Its latest filing is for cameron electrical substation.
Is there other construction near 1312 Rutherford Ln?
Yes. Nearby filings include 1310 1/2 Rutherford Ln (remove (3) ahloa radios and (3) aehc antennas. install (3) ahlob radios and (3) avha antennas. each replacement model is of the same size and smaller weight than the model currently installed. no electrical work. existing cell tower, Nov 16, 2026); 1319 Park Center Dr (1319 park center, Apr 9, 2021); 1300 Park Center Dr (upgrade dual feed going to home depot data center, Feb 12, 2024).
How do I get alerts for new permits at 1312 Rutherford Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1310 1/2 Rutherford LnNov 16, 2026Remove (3) ahloa radios and (3) aehc antennas. install (3) ahlob radios and (3) avha antennas. each replacement model is of the same size and smaller weight than the model currently installed. no electrical work. existing cell tower · 37 m away
- 1319 Park Center DrApr 9, 20211319 park center · 99 m away
- 1300 Park Center DrFeb 12, 2024Upgrade dual feed going to home depot data center · 146 m away
- 1404 Park Center DriveDec 4, 2025Dell pc1 lobby — renovation/alteration — mep system upgrade and expansion, including construction of a new exterior mep equipment yard in existing parking lot · 163 m away
- 1404 Park Center Drive · Dell Usa LPApr 22, 2026Dell pc1 ocs q — renovation/alteration — adding a new server rack containment with supporting mep equipment and a small office remodel with some exterior mep yard work · 163 m away
- 1404 Park Center DriveMay 16, 2024Pc1 ocs m — renovation/alteration — installation of new server racks, hot aisle containment, associated electrical and mechanical upgrades · 163 m away
- 1321 Rutherford LnJul 26, 2024Gday we are needing to upgrade an existing service from 400amp 480v 3ph to 600amp. i have the approved espa from christian pope and he has confirmed the existing transformer is large enough and i can move forward with the permit. cheers grant meter can size: 600 · 165 m away
- 1404 Park Center DrNov 4, 2026Adding 6 di fire service connecting to existing fire service for proposed fire hydrant ref: 24-162698 da · 210 m away
- 1404-1/2 Park Center DrJul 1, 2023Dell- park center 1 gates · 216 m away
- 1130 Rutherford LnNov 6, 2026Replacement of a like for like 6-ton package unit · 254 m away
- 1404-1/2 Rutherford LnJan 2, 20188100 cameron lane parking improvements · 337 m away
- 1130 Rutherford Lane · Cameron Rd Corporate Park II Bldg. 2May 7, 2025Cameron rd spec suite — renovation/alteration — the scope of work includes a tenant office build-out to a previously permitted shell warehouse building · 353 m away