13301 Bennington Ln
Austin, TX 78753
Sewer replacement permitted at 13301 Bennington Ln
A City of Austin plumbing permit describes a 35 tunnel sewer replacement at 13301 Bennington Ln. The permit was filed on November 5, 2025, and its status is Final.
Summarized from City of Austin records · updated Nov 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2025
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled35 tunnel sewer replacement
- AppliedNov 4, 2025
- IssuedNov 5, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 20, 2025
Passed final inspection Nov 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project35 tunnel sewer replacement
35 tunnel sewer replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-142226 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13301 Bennington Ln
What work is planned at 13301 Bennington Ln?
A City of Austin plumbing permit describes a 35 tunnel sewer replacement. It was filed on November 5, 2025.
When was the sewer replacement permitted at 13301 Bennington Ln?
The permit was filed on November 5, 2025.
What is the permit number for work at 13301 Bennington Ln?
The City of Austin permit number is 2025-142226 PP.
Is the 13301 Bennington Ln sewer permit approved?
The permit record lists its status as Final.
Is new construction planned at 13301 Bennington Ln?
The available City of Austin record is for a plumbing permit describing a 35 tunnel sewer replacement.
Also being built nearby
All of 78753- 1106 Haverford DrApr 29, 2024Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 1108 Haverford DrOct 5, 202650ft water yard line repair and a 50gal gas tank water heater changeout · 60 m away
- 13216 Bennington LnNov 10, 2026Replace 40-gallon gas water heater located in an elevated cabinet inside the garage · 61 m away
- 13214 Bennington LnSep 11, 2024Excavate 24 tunnel to repair main drain line under house · 72 m away
- 13308 Bennington LnAug 5, 2025Express: foundation repair/22 push piers · 84 m away
- 1109 Haverford DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 13207 Bennington LnDec 11, 2024Replacement of an existing water heater · 109 m away
- 1113 Haverford DrAug 1, 2024Request to disconnect replace existing main panel with 125amp mb panel. not replacing existing meter can · 122 m away
- 13205 Bennington LnMar 6, 2024Replacement of an existing water heater · 122 m away
- 1110 Blue Fox DrSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 159 m away
- 1202 Haverford DrJul 19, 2025Repair a drain line under the house by the garage 15 away from clean out · 169 m away
- 1114 Blue Fox DrSep 9, 2025Repair sewer line under home 25 feet master bathroom drain lines for toilet and two lavs and tub 1 access hole · 170 m away