groundranger
Active · latest filing Sep 2026Commercial

1410 E Anderson Ln Svrd Wb

Austin, TX 78753

Sewer line repair permitted at 1410 E Anderson Lane

An active City of Austin plumbing permit indicates a damaged sewer line is being exposed and repaired at 1410 E Anderson Ln Svrd Wb. Filed September 8, 2026, permit 2026-117414 PP describes a clogged or broken line that was backing up waste through cleanouts and onto the parking lot. A separate HVAC replacement permit filed in March 2025 is expired.

Summarized from City of Austin records · updated Sep 8, 2026

Projects
2
2 filings
Latest filing
Sep 8, 2026
since Mar 26, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Sewer line was clogged/broken and backing up waste through clean outs and spilling onto parking lot. restaurant got shut down by the city of austin until it got repaired. permit for exposing pipe and replacing damaged section of sewer line so its draining properly

  1. AppliedSep 8, 2026
  2. IssuedSep 8, 2026
  3. WorkSep '26 – Apr '27
  4. Final inspection
31% through of the permit windowSep 8, 2026 → Apr 26, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Sewer line was clogged/broken and backing up waste through clean outs and spilling onto parking lot. restaurant got shut down by the city of austin until it got repaired. permit for exposing pipe and replacing damaged section of sewer line so its draining properly

    Sewer line was clogged/broken and backing up waste through clean outs and spilling onto parking lot. restaurant got shut down by the city of austin until it got repaired. permit for exposing pipe and replacing damaged section of sewer line so its draining properly

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work we will change out all of the old hvac equipemt and replace with new equipment new unit will require a curb adapter

    Replacement of complete existing central heat and air system with or without duct work we will change out all of the old hvac equipemt and replace with new equipment new unit will require a curb adapter

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1410 E Anderson Ln Svrd Wb

What is happening at 1410 E Anderson Ln Svrd Wb in Austin?

An active plumbing permit indicates that a damaged section of sewer line is being exposed and replaced. The permit, 2026-117414 PP, was filed September 8, 2026.

Is a new building being built at 1410 E Anderson Lane?

The records provided describe sewer line repair, not construction of a new building.

Why was a sewer repair permitted at 1410 E Anderson Ln?

The permit description says a clogged or broken sewer line was backing up waste through cleanouts and spilling onto the parking lot. The scope is to expose the pipe and replace the damaged section.

Is a restaurant opening at 1410 E Anderson Lane?

The permit records do not identify a restaurant opening. The September 2026 permit covers sewer line repair and says the restaurant had been shut down by the city until the repair was completed.

What work was permitted at 1410 E Anderson Ln in 2025?

A mechanical permit filed March 26, 2025, covered replacement of the existing central heating and air system. That permit, 2025-033570 MP, is expired.

What's happening near Artivion Building B on East Anderson Lane?

At 1410 E Anderson Ln Svrd Wb, about 118 meters from Artivion Building B, an active permit covers repair of a damaged sewer line. It was filed September 8, 2026.

Also being built nearby

All of 78753

More parking structures in 78753, restaurants in 78753.

Email me when it passes final inspection