209 E Longspur Blvd
Austin, TX 78753
209 E Longspur Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 209 E Longspur Blvd, Austin, TX 78753. The most recent, filed February 7, 2024, covers: “Gas water heater changeout prv”.
Compiled from City of Austin records · updated Feb 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 7, 2024
- since Feb 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas water heater changeout prv
- AppliedFeb 5, 2024
- IssuedFeb 7, 2024
- WorkFeb '24 – Jun '24
- Final inspectionJun 11, 2024
Passed final inspection Jun 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas water heater changeout prv
Gas water heater changeout prv
City of Austin permitPlumbing PermitFinal- Record
- 2024-014204 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 209 E Longspur Blvd
What is being built at 209 E Longspur Blvd?
The latest filing (City of Austin permit 2024-014204 PP, February 7, 2024) covers gas water heater changeout prv.
How many permits and filings does 209 E Longspur Blvd have?
1 filing across 1 project, from February 7, 2024 to February 7, 2024.
Is there other construction near 209 E Longspur Blvd?
Yes. Nearby filings include 9902 Oriole Dr (replacement of complete existing central heat and air system with or without duct work, Aug 17, 2026); 105 E Longspur Blvd (replacement of complete existing central heat and air system with or without duct work, Jan 6, 2026); 9708 Oriole Dr (upgrade electrical service from 100a to 200a, Feb 23, 2024).
How do I get alerts for new permits at 209 E Longspur Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 9902 Oriole DrAug 17, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 105 E Longspur BlvdJan 6, 2026Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 9708 Oriole DrFeb 23, 2024Upgrade electrical service from 100a to 200a · 117 m away
- 9905 Oriole DrJun 3, 2026Excavate 6 tunnel to repair the main drain line under the house · 138 m away
- 101 E Starling DrJun 16, 2026Replacement of complete existing central heat and air system with or without duct work · 181 m away
- 109 E Garrett RunSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 185 m away
- 105 W Longspur BlvdNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 210 m away
- 10000 Derringer TrlDec 30, 2024Replacement of complete existing central heat and air system with or without duct work · 221 m away
- 10000-1/2 Brownie DrNov 14, 2016Brownie drive · 242 m away
- 101 Etta PlOct 19, 2026Base: installing a backup battery system and additional meter socket · 245 m away
- 308 E Garrett RunJul 18, 2025Replacement of complete existing central heat and air system with or without duct work · 253 m away
- 10005 Derringer TrlNov 18, 2025Replacement of an existing water heater rita gallahan · 255 m away