210 Elliott St
Austin, TX 78753
210 Elliott St: 1 project on record
City of Austin lists 1 filing across 1 project at 210 Elliott St, Austin, TX 78753. The most recent, filed March 17, 2009, covers: “Fiskville school addition, lot 11 block 1, resubdivision”.
Compiled from City of Austin records · updated Mar 17, 2009
- Projects
- 1
- 1 filings
- Latest filing
- Mar 17, 2009
- since Mar 17, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 210 Elliott St
What is being built at 210 Elliott St?
The latest filing (City of Austin case 105211, March 17, 2009) covers fiskville school addition, lot 11 block 1, resubdivision.
How many permits and filings does 210 Elliott St have?
1 filing across 1 project, from March 17, 2009 to March 17, 2009.
Is there other construction near 210 Elliott St?
Yes. Nearby filings include 210 W Elliott St (express- express repairs due to fire damage, Aug 30, 2026); 305 Deen Ave (austin revival center, Mar 2, 2007); 209 W Elliott St (***emergency*** replace meter base and main panel (125 amp overhead), Jan 24, 2024).
How do I get alerts for new permits at 210 Elliott St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 210 W Elliott StAug 30, 2026Express- express repairs due to fire damage
- 305 Deen AveMar 2, 2007Austin revival center · 54 m away
- 209 W Elliott StJan 24, 2024***emergency*** replace meter base and main panel (125 amp overhead) · 69 m away
- 501 Deen AveOct 28, 2024Emergency repair - repair burnt wires for line side on meter · 70 m away
- 206 Deen AveFeb 21, 2025Express: replace 3 windows like for like · 107 m away
- 106 W Elliott StOct 15, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 200 Deen AveJul 17, 2025*partial demolition* interior remodel · 122 m away
- 8608 Guadalupe StMar 10, 2026New 2 story dwelling 3 bedroom 2.5 bathroom with new driveway · 124 m away
- 500 Deen AveDec 15, 2023Rebuild 200a main service · 126 m away
- 502 Deen AveSep 14, 2026Replacing service for duplex - upgrade to 200amp per unit - total 400amps · 138 m away
- 106 Deen AveOct 27, 2024Tunnel approximately 40 and replace all underfloor cast iron sanitary waste and vent piping with new pvc piping · 140 m away
- 603 W Elliott StMar 7, 2024Upgrade an existing overhead 200amp service to a 300amp service with two meters for the primary residence (603 w elliott st) and the 2nd building (603 w elliott st building 2) · 146 m away