500 Vfw Rd
Austin, TX 78753
Permit records show replacement of two HVAC systems
A City of Austin mechanical permit filed Sept. 17, 2025, records a like-for-like replacement of two existing HVAC systems at 500 VFW Rd: one 5-ton horizontal gas system and one 5-ton horizontal electric system. The permit is marked Final; a 2007 site-plan case for the address is named Sprint PCS-Walnut Creek.
Summarized from City of Austin records · updated Sep 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 17, 2025
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system like for like: 5 ton horizontal electric system **two system change out
- AppliedSep 12, 2025
- IssuedSep 17, 2025
- WorkSep '25 – Feb '26
- Final inspectionFeb 5, 2026
Passed final inspection Feb 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system like for like: 5 ton horizontal electric system **two system change out
Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system like for like: 5 ton horizontal electric system **two system change out
City of Austin permitMechanical PermitFinal- Record
- 2025-116186 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 Vfw Rd
What is happening at 500 VFW Rd in Austin?
A City of Austin permit filed Sept. 17, 2025, records a like-for-like changeout of two existing HVAC systems. The permit, 2025-116186 MP, is marked Final.
Is a new building being built at 500 VFW Rd?
The available recent permit is for replacing existing HVAC systems, not for new construction. It describes a two-system changeout.
What HVAC systems are being replaced at 500 VFW Rd?
Permit 2025-116186 MP describes a 5-ton horizontal gas system and a 5-ton horizontal electric system, both replaced like for like.
What is the status of the 500 VFW Rd permit?
The City of Austin mechanical permit 2025-116186 MP was filed Sept. 17, 2025, and is marked Final.
Was there a Sprint PCS project at 500 VFW Rd?
A City of Austin site-plan case filed March 2, 2007, is named Sprint PCS-Walnut Creek and is marked Approved and Released.
Also being built nearby
All of 78753- 12012 Natures BndSep 17, 2026Base: installing a backup battery system and additional meter socket · 84 m away
- 11916 Natures BndFeb 17, 2026Replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater · 111 m away
- 12009 Natures BndAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 11921 Natures BndJun 25, 2024Install evse · 139 m away
- 11917 Natures BndNov 3, 2025Covered porch addition to single-story sfr 360 sq ft · 145 m away
- 11900 Natures BndJul 28, 2025Installation of an ev charger in the garage · 157 m away
- 11905 Natures BndJun 20, 2024Replacement of complete existing central heat and air system with or without duct work · 172 m away
- 821 Waterfall WayJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 183 m away
- 712 Waterfall WayMar 14, 2024Replacement of complete existing central heat and air system with or without duct work · 195 m away
- 837 Waterfall WayOct 8, 2026Replacement of complete existing central heat and air system with or without duct work · 211 m away
- 808 Waterfall WayNov 3, 2025Install of sump pump · 222 m away
- 705 Clear Stream XingJun 14, 2024Install ev charger · 222 m away