501 Carpenter Ave
Austin, TX 78753
501 Carpenter Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 501 Carpenter Ave, Austin, TX 78753. The most recent, filed April 22, 2025, covers: “Tunnel and replace the underfloor waste and vent piping for the bathroom”.
Compiled from City of Austin records · updated Apr 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 22, 2025
- since Apr 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel and replace the underfloor waste and vent piping for the bathroom
- AppliedApr 21, 2025
- IssuedApr 22, 2025
- WorkApr '25 – May '25
- Final inspectionMay 1, 2025
Passed final inspection May 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel and replace the underfloor waste and vent piping for the bathroom
Tunnel and replace the underfloor waste and vent piping for the bathroom
City of Austin permitPlumbing PermitFinal- Record
- 2025-048759 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 501 Carpenter Ave
What is being built at 501 Carpenter Ave?
The latest filing (City of Austin permit 2025-048759 PP, April 22, 2025) covers tunnel and replace the underfloor waste and vent piping for the bathroom.
How many permits and filings does 501 Carpenter Ave have?
1 filing across 1 project, from April 22, 2025 to April 22, 2025.
Is there other construction near 501 Carpenter Ave?
Yes. Nearby filings include 8910 Glenn Ln (kinsey will tunnel under home to expose kitchen drain and repair section of cast iron. install new pvc in its place and hang pipe from slab. backfill engineer report. one access hole on left side of home in back yard we will be cutting 10 ft of sheetrock to access two vent stacks roughly 20 sq ft), Jul 31, 2025); 600 Carpenter Ave (express: foundation repair/releveling of the existing slab-on-grade foundation for the existing single-family residential structure. the scope includes installation of twelve concrete drilled piers approximately 10 feet deep and 12 inches in diameter using #4 reinforcing steel in accordance with the attached engineered foundation repair plan. there is no interior remodel no added square footage and no increase to impervious cover. the total remodeled square footage is listed as 0.00 sq ft, Jun 25, 2026); 8912 Glenn Ln (per tx gas we need to relocate the gas meter away from electrical doorways and windows. thanks, May 6, 2025).
How do I get alerts for new permits at 501 Carpenter Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 8910 Glenn LnJul 31, 2025Kinsey will tunnel under home to expose kitchen drain and repair section of cast iron. install new pvc in its place and hang pipe from slab. backfill engineer report. one access hole on left side of home in back yard we will be cutting 10 ft of sheetrock to access two vent stacks roughly 20 sq ft) · 53 m away
- 600 Carpenter AveJun 25, 2026Express: foundation repair/releveling of the existing slab-on-grade foundation for the existing single-family residential structure. the scope includes installation of twelve concrete drilled piers approximately 10 feet deep and 12 inches in diameter using #4 reinforcing steel in accordance with the attached engineered foundation repair plan. there is no interior remodel no added square footage and no increase to impervious cover. the total remodeled square footage is listed as 0.00 sq ft · 63 m away
- 8912 Glenn LnMay 6, 2025Per tx gas we need to relocate the gas meter away from electrical doorways and windows. thanks · 71 m away
- 505 Grissom CtNov 15, 2023Excavate 40 tunnel to repair drain line · 97 m away
- 611 Carpenter AveMar 10, 2026Change of use from admin/office to personal services 2025 111043 da - approved · 101 m away
- 8901 Shepard DrJun 20, 2024Corner lot; construct new driveway approach of 12 ft and curb & gutter of 18 ft · 103 m away
- 9000 Slayton DrJun 10, 2025Per tx gas relocate the gas meter away from ac unit electrical and crawl space vents · 126 m away
- 8909 Slayton DrApr 11, 2024200amp overhead service rebuild with new meter can · 139 m away
- 8911 N Lamar BlvdJan 7, 2025Remove existing canopy image on the north elevation and replace with new · 140 m away
- 8911 Slayton DrNov 16, 2023100amp overhead service rebuild with new 200amp meter can · 141 m away
- 8903 Slayton DrFeb 19, 2025Replacement of an existing water heater · 146 m away
- 8825 Lamar BlvdMar 2, 2007Acwp: little walnut creek at quail creek · 156 m away