8506 Shenandoah Dr
Austin, TX 78753
Sewer line repair permitted at 8506 Shenandoah Dr
A sewer line repair under the house was permitted on January 30, 2026. The City of Austin permit describes removing damaged pipes and replacing them with Schedule 40 PVC; its status is final.
Summarized from City of Austin records · updated Jan 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 30, 2026
- since Jan 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepair sewer line under house remove damaged pipes and replaced with new schedule 40 pvc
- AppliedJan 29, 2026
- IssuedJan 30, 2026
- WorkJan '26 – Mar '26
- Final inspectionMar 9, 2026
Passed final inspection Mar 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepair sewer line under house remove damaged pipes and replaced with new schedule 40 pvc
Repair sewer line under house remove damaged pipes and replaced with new schedule 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2026-010838 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8506 Shenandoah Dr
What is being built at 8506 Shenandoah Dr?
The City of Austin record lists a sewer line repair under the house, not a new building. The work is described in permit 2026-010838 PP.
What work was permitted at 8506 Shenandoah Dr?
Permit 2026-010838 PP covers removing damaged sewer pipes under the house and replacing them with Schedule 40 PVC.
When was the sewer repair at 8506 Shenandoah Dr permitted?
The City of Austin permit was filed on January 30, 2026.
Is the permit for 8506 Shenandoah Dr final?
Yes. Permit 2026-010838 PP is listed with a final status.
Is a new home being built at 8506 Shenandoah Dr?
The listed permit is for plumbing work to repair a sewer line under the house. It does not describe new home construction.
Also being built nearby
All of 78753- 8507 Shenandoah DrJun 24, 2026Rebuild 200 amp service on side of house · 49 m away
- 908 Pepperell CtNov 25, 2024Emergency 125-amp overhead service rebuild (tree fell on service drop) · 53 m away
- 8505 Shenandoah DrJun 4, 2025Replacement of complete existing central heat and air system with or without duct work like for like system change out - installing trane xv18 up flow gas · 58 m away
- 8508 Loralinda DrAug 10, 2026Interior remodel · 93 m away
- 913 Hermitage DrJun 10, 2025Excavate yard to replace approximately 20 ft of sewer line. between home and city tap · 93 m away
- 8517 Shenandoah DrDec 4, 2023Excavate 15 tunnel for drain line repair & 38 for yardline repair · 94 m away
- 907 Hermitage DrJul 1, 2024Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 915 Hermitage DrOct 20, 2026Express: replace existing shower with new shower in master bedroom. replace bathroom window. like for like · 103 m away
- 902 Potomac PathMar 4, 2025*partial demolition* covered porch enclosure and screened porch addition · 122 m away
- 8509 Grayledge DrNov 24, 2023Express: replace 3 windows like for like · 132 m away
- 8521 Shenandoah DrMay 24, 2024Request to disconnect for new 200 meter and 200 amp main breaker panel · 132 m away
- 1001 Weeping Willow DrMay 20, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away