905 W Howard Ln
Austin, TX 78753
905 W Howard Ln permit changes warehouse to light manufacturing
City of Austin permit records indicate an interior remodel and change of use from limited warehouse and distribution to a light manufacturing building at 905 W Howard Ln. The building permit was filed December 3, 2025, and describes work in a 200,000-square-foot building. Related plumbing, mechanical and electrical permits were filed through October 26, 2026; the building and mechanical permits are listed as expired.
Summarized from City of Austin records · updated Oct 26, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 26, 2026
- since Dec 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(6) 30 amp 40 volt feeders to new equipment
- AppliedSep 19, 2025
- IssuedOct 26, 2026
- WorkOct '26 – Nov '26
- Final inspectionNov 10, 2026
Passed final inspection Nov 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projects(6) 30 amp 40 volt feeders to new equipment
(6) 30 amp 40 volt feeders to new equipment
City of Austin permitElectrical PermitFinal- Record
- 2025-119884 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
City of Austin permitMechanical PermitExpired- Record
- 2025-149691 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2025-149691 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
Eplan: commercial expedited review - [approved] interior remodel and change of use from limited warehouse and distribution to light manufacturing building (200000 sq ft)
City of Austin permitBuilding PermitExpired- Record
- 2025-149691 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
One for one exterior fixture replacement with led fixtures. all new fixtures are dark sky compliant per city of austin subchapter e requirements. replacements are one for one and utilizing all existing circuitry and controls
One for one exterior fixture replacement with led fixtures. all new fixtures are dark sky compliant per city of austin subchapter e requirements. replacements are one for one and utilizing all existing circuitry and controls
City of Austin permitElectrical PermitFinal- Record
- 2023-090647 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 905 W Howard Ln
What is being built at 905 W Howard Ln in Austin?
City of Austin records describe an interior remodel and change of use from limited warehouse and distribution to light manufacturing. The permit describes a 200,000-square-foot building.
Is 905 W Howard Ln changing from a warehouse to a manufacturing building?
Yes. Permit 2025-149691 BP describes a change of use from limited warehouse and distribution to a light manufacturing building. It was filed December 3, 2025, and is listed as expired.
How large is the light manufacturing building at 905 W Howard Ln?
The permit description identifies a 200,000-square-foot building. The fact sheet does not provide a separate project cost estimate.
When were permits filed for 905 W Howard Ln?
The building permit was filed December 3, 2025. Related plumbing and mechanical permits followed in January and May 2026, and an electrical permit was filed October 26, 2026.
Are the permits for 905 W Howard Ln approved or expired?
The building permit and mechanical permit are listed as expired, while the plumbing permit and October 2026 electrical permit are listed as final. The permit descriptions identify the remodel and change of use as approved.
What is changing near US Farathane on W Howard Lane?
At 905 W Howard Ln, about 441 meters from US Farathane, Austin permit records describe a change from limited warehouse and distribution use to light manufacturing. The permit describes an interior remodel in a 200,000-square-foot building.
Also being built nearby
All of 78753- 905 Howard LnFeb 24, 2009Tech. ridge, resubdivision of lot 4 block a — tech. ridge; resubdivision of lot 4 block a (c8-99-0086.oa)
- 13600 Mc Callen PassNov 18, 2026Esp - mccallen pass - workhub developments · 222 m away
- 801 Howard LnJan 14, 2025Resubdivsion of lot 3 of the resubdivision of lot 4, block "a" tech.ridge · 262 m away
- 605 Howard LnJul 6, 2016Building 3.1, tech.ridge section three · 278 m away
- 600 Center Ridge DrOct 17, 2013Tech ridge section 2 · 281 m away
- 605 W Howard Ln · Kompan Inc.Feb 9, 2026Expansion of current office space; no corrections or changes to the current site plan; no additional work in warehouse - suite 101 · 296 m away
- 900 Center Ridge DrMar 2, 2007I-35 techridge park & ride, center line pass · 340 m away
- 611 Center Ridge DrMar 24, 2016Techridge section 2, buildings 2.0 and 2.1 · 363 m away
- 817 W Howard LnMay 18, 2026Minor remodel for tenant capmetro · 363 m away
- 525 W Howard Ln · 501 Howard LLCNov 5, 2026Qt - dumpster enclosure at new gas station. gast station and other structures permitted seperatly - ova · 365 m away
- 525 Howard LnNov 18, 2026Mccallen retail center · 366 m away
- 525 W Howard Lane · 501 Howard LLCAug 31, 2026Smiling donuts howard — new construction — new donut shop building out of a shell space · 370 m away