A permit filed February 3, 2026, covers replacing an existing 40-gallon gas water heater at 9711 Marlborough Dr. The City of Austin permit, 2026-012343 PP, is marked final.
Summarized from City of Austin records · updated Feb 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater remove and replace water heater - 40 gal gas
- AppliedFeb 2, 2026
- IssuedFeb 3, 2026
- WorkFeb '26 – Feb '26
- Final inspectionFeb 9, 2026
Passed final inspection Feb 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater remove and replace water heater - 40 gal gas
Replacement of an existing water heater remove and replace water heater - 40 gal gas
City of Austin permitPlumbing PermitFinal- Record
- 2026-012343 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9711 Marlborough Dr
What is being built at 9711 Marlborough Dr?
The City of Austin permit covers replacing an existing 40-gallon gas water heater. It does not describe new construction.
When was the water heater permit filed?
The permit was filed on February 3, 2026.
What is the permit number for 9711 Marlborough Dr?
The City of Austin permit number is 2026-012343 PP. Its status is final.
Is a new water heater being installed at 9711 Marlborough Dr?
The permit describes removing and replacing an existing 40-gallon gas water heater.
Is new construction planned at 9711 Marlborough Dr?
The available permit record is for a water heater replacement, not new construction.
Also being built nearby
All of 78753- 9701 Marlborough DrFeb 27, 2025Replacement of complete existing central heat and air system with or without duct work hvac replacement · 15 m away
- 9712 Halifax DrAug 7, 2026Request to disconnect -- i need to pull meter to replace 125-amp federal panel to new sq.d 125-amp panel with a 125 main breaker. the meter will remain as is · 69 m away
- 9706 Halifax DrFeb 14, 2024Excavate and replace roughly 35 of sewer pipe with new schedule 40 pvc · 76 m away
- 9802 Halifax DrMar 28, 2025Replacing meter can and main breaker box update grounding system replace interior subpanel redevice house intall new 4-wire dryer circuit · 87 m away
- 9613 Aberdeen WayOct 24, 2025Removal and replacement of 16.0 of the underground waste water removal system laid onto a bed of sand at specified grade · 112 m away
- 9803 Halifax DrApr 16, 2024Replacement of an existing water heater · 127 m away
- 1405 Greenwich DrJul 24, 2026Replacement of complete existing central heat and air system with or without duct work 4 tons condenser changeout including indoor coil and 88k btus furnace 80% heater afue changeout · 129 m away
- 9803 Aberdeen WayAug 23, 2024Express: foundation repair · 133 m away
- 9803 Marlborough DrAug 14, 2024Disconnect/reconnect no meter work done *add to: 2024-086269 ep* new 200a main service panel · 139 m away
- 9805 Marlborough DrApr 1, 2024Temporary disconnect and reconnect of power on an occupied dwelling for a service rebuild · 142 m away
- 9808 Marlborough DrSep 10, 2025**replace broken existing sewer main- yard line · 146 m away
- 9706 Kendal DrDec 29, 2025Excavate 30 tunnel to repair main drain line under house · 150 m away