groundranger
Recent · latest filing Oct 2025Residential

9805 Kendal Dr

Austin, TX 78753

Rooftop solar and battery storage permitted at 9805 Kendal Dr

City of Austin permits filed October 24, 2025, cover a 14.45-kW rooftop solar system and a 13.5-kW energy storage system for an existing residence at 9805 Kendal Dr. A separate permit filed June 25, 2025, covers an electric service upgrade and EVSE installation.

Summarized from City of Austin records · updated Oct 24, 2025

Projects
3
3 filings
Latest filing
Oct 24, 2025
since Jun 25, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

  1. AppliedOct 21, 2025
  2. IssuedOct 24, 2025
  3. WorkOct '25 – Dec '25
  4. Final inspectionDec 8, 2025

Passed final inspection Dec 8, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 14.45 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    Install new 14.45 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Upgrade main electric service and install evse

    Upgrade main electric service and install evse

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9805 Kendal Dr

What is being installed at 9805 Kendal Dr?

City of Austin permit 2025-136223 EP covers a 14.45-kW rooftop solar system and a 13.5-kW energy storage system for an existing residence. It was filed October 24, 2025.

Is a new home being built at 9805 Kendal Dr?

The October 2025 solar and energy storage permit describes work for an existing residence, not a new home.

When was the solar system permitted at 9805 Kendal Dr?

Permit 2025-136223 EP was filed on October 24, 2025. The City of Austin record lists its status as Final.

Is battery storage included with the solar installation?

Yes. Permit 2025-136223 EP specifies a 13.5-kW energy storage system alongside the 14.45-kW rooftop solar system.

Is the electrical service being upgraded for the solar installation?

Permit 2025-136233 EP covers disconnecting and reconnecting to tie in the solar and energy storage components. Its description says the service and meter sizes are not being upgraded.

What other electrical work was permitted at 9805 Kendal Dr?

A June 25, 2025, permit, 2025-078265 EP, covers an upgrade to the main electric service and installation of EVSE.

What's being installed near SL Project Texas 2 on Dessau Road?

At 9805 Kendal Dr, about 162 meters from the listed SL Project Texas 2 location, City of Austin permits cover rooftop solar and energy storage for an existing residence. The solar and storage permit was filed October 24, 2025.

Also being built nearby

All of 78753

More warehouses & industrial in 78753, solar installs in 78753.

Email me when a new permit is filed