9810 Marlborough Dr
Austin, TX 78753
9810 Marlborough Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9810 Marlborough Dr, Austin, TX 78753. The most recent, filed April 4, 2024, covers: “Express replace 1 existing window”.
Compiled from City of Austin records · updated Apr 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 4, 2024
- since Apr 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress replace 1 existing window
- AppliedMar 27, 2024
- IssuedApr 4, 2024
- WorkApr '24 – Aug '24
- Final inspectionAug 19, 2024
Passed final inspection Aug 19, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress replace 1 existing window
Express replace 1 existing window
City of Austin permitBuilding PermitFinal- Record
- 2024-041252 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9810 Marlborough Dr
What is being built at 9810 Marlborough Dr?
The latest filing (City of Austin permit 2024-041252 BP, April 4, 2024) covers express replace 1 existing window.
How many permits and filings does 9810 Marlborough Dr have?
1 filing across 1 project, from April 4, 2024 to April 4, 2024.
Is there other construction near 9810 Marlborough Dr?
Yes. Nearby filings include 9808 Marlborough Dr (**replace broken existing sewer main- yard line, Sep 10, 2025); 9811 Marlborough Dr (whole house water re-pipe and replace the water heater. approximately 75 square feet of drywall removed. no tunneling. water line re-pipe only, Nov 18, 2025); 9805 Marlborough Dr (temporary disconnect and reconnect of power on an occupied dwelling for a service rebuild, Apr 1, 2024).
How do I get alerts for new permits at 9810 Marlborough Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 9808 Marlborough DrSep 10, 2025**replace broken existing sewer main- yard line · 13 m away
- 9811 Marlborough DrNov 18, 2025Whole house water re-pipe and replace the water heater. approximately 75 square feet of drywall removed. no tunneling. water line re-pipe only · 13 m away
- 9805 Marlborough DrApr 1, 2024Temporary disconnect and reconnect of power on an occupied dwelling for a service rebuild · 20 m away
- 9803 Marlborough DrAug 14, 2024Disconnect/reconnect no meter work done *add to: 2024-086269 ep* new 200a main service panel · 23 m away
- 1405 Greenwich DrJul 24, 2026Replacement of complete existing central heat and air system with or without duct work 4 tons condenser changeout including indoor coil and 88k btus furnace 80% heater afue changeout · 74 m away
- 9803 Aberdeen WayAug 23, 2024Express: foundation repair · 79 m away
- 1404 Greenwich DrDec 10, 2024Replace the sanitary sewer yard line from where it exists the right side of the house to the city connection at the front right easement. approximately 40 ft · 79 m away
- 9836 Childress DrMar 24, 2026Express: foundation repair · 91 m away
- 9802 Halifax DrMar 28, 2025Replacing meter can and main breaker box update grounding system replace interior subpanel redevice house intall new 4-wire dryer circuit · 121 m away
- 1401 Manford Hill DrOct 20, 2025*partial demolition* interior remodel · 141 m away
- 9841 Childress DrJan 24, 2025Total demolition of pool ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 142 m away
- 9803 Halifax DrApr 16, 2024Replacement of an existing water heater · 147 m away