10805 Cameron Rd
Austin, TX 78754
Site plan approved for CAP - N Demand Base in Austin
A site plan for CAP - N Demand Base at 10805 Cameron Road was approved and released on April 22, 2026. The City of Austin record does not specify the project’s use, size or cost.
Summarized from City of Austin records · updated Apr 22, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Apr 22, 2026
- since Mar 4, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 10805 Cameron Rd
What is being built at 10805 Cameron Road?
A City of Austin site-plan case named CAP - N Demand Base was approved and released on April 22, 2026. The record does not describe what the project will be used for.
What is CAP - N Demand Base in Austin?
CAP - N Demand Base is the name on a City of Austin site-plan case for 10805 Cameron Road. Case 13404246 was approved and released on April 22, 2026.
Has construction been approved at 10805 Cameron Road?
The City of Austin lists site-plan case 13404246 as “Approved and Released” on April 22, 2026. The record does not provide construction details or a start date.
Is a concrete crushing facility planned at 10805 Cameron Road?
A site-plan case named Capital City Concrete Crushing Facility was filed for this address on September 25, 2024, but its status is expired. The latest listed case is CAP - N Demand Base, approved and released April 22, 2026.
What happened to the Barr Lane recycling facility proposal?
The City of Austin lists the Barr Lane Recycling Facility case, 12887182, as expired. It was filed on April 25, 2022.
When was the latest project filed for 10805 Cameron Road?
The latest listed case is CAP - N Demand Base, dated April 22, 2026. Its City of Austin case number is 13404246.
Also being built nearby
All of 78754- 10805-1/2 Cameron RdAug 11, 2019Springdale park (with r c8j-2018-0040) · 129 m away
- 10610-1/2 Cameron RdJun 7, 2024Cameron rd widening & blue good rd roadway improvements · 177 m away
- 4715 Blue Goose RdJun 18, 2026Capital city concrete recycling facility (with r sp-2024-0376d) · 191 m away
- 4806 Blue Goose Rd · Keith ParkanNov 17, 2026Braker valley phase 3 · 247 m away
- 11117 Pack Wagon TrlJun 4, 2026Sewer spot repair: approximately 5 feet of repair taking place · 343 m away
- 10911-1/2 Cameron RdSep 8, 2026Cameron road widening · 370 m away
- 10801 Mule Train DrJun 25, 2024Express foundation repair install 25 exterior & 11interior pilings · 385 m away
- 11124 Night Camp DrOct 10, 2024Express: foundation repair · 414 m away
- 11029 Night Camp DrAug 20, 2026200amp panel restoration due to burning. no meter work being done. austin energy is the electrical provider · 442 m away
- 11104 Night Camp DrOct 1, 2024Repair break in cleanout · 459 m away
- 11009 Night Camp DrJan 7, 2026Express - foundation repair - installing 25 ext. piling and 18 int pilings · 474 m away
- 11000 Pack Wagon TrlOct 22, 2026Replacement of complete existing central heat and air system with or without duct work · 484 m away