3.72 kW of solar capacity planned at 11417 Flushwing Dr

An electrical permit filed October 27, 2026, calls for adding 3.72 kW of photovoltaic capacity to the existing system at 11417 Flushwing Dr in Austin. The City of Austin lists permit 2026-137207 EP as active.

Summarized from City of Austin records · updated Oct 27, 2026

Projects
1
1 filings
Latest filing
Oct 27, 2026
since Oct 27, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Adding 3.72 kw of pv to existing system

  1. AppliedOct 19, 2026
  2. IssuedOct 27, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
11% through of the permit windowOct 27, 2026 → Apr 25, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Adding 3.72 kw of pv to existing system

    Adding 3.72 kw of pv to existing system

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11417 Flushwing Dr

What is being built at 11417 Flushwing Dr?

A City of Austin electrical permit calls for adding 3.72 kW of photovoltaic capacity to an existing system. The permit does not describe a new building.

Is solar being installed at 11417 Flushwing Dr?

Permit 2026-137207 EP indicates an addition of 3.72 kW of photovoltaic capacity to the existing system.

When was the solar permit filed for 11417 Flushwing Dr?

The City of Austin permit was filed on October 27, 2026.

Is the 11417 Flushwing Dr permit active?

Yes. The City of Austin lists electrical permit 2026-137207 EP as active.

How much solar capacity is being added at 11417 Flushwing Dr?

The permit description says 3.72 kW of photovoltaic capacity will be added to the existing system.