11502-1/2 Samsung Blvd
Austin, TX 78754
11502-1/2 Samsung Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 11502-1/2 Samsung Blvd, Austin, TX 78754. The most recent, filed October 28, 2017, covers: “Pioneer crossing east section 4b”.
Compiled from City of Austin records · updated Oct 28, 2017
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2017
- since Oct 28, 2017
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 11502-1/2 Samsung Blvd
What is being built at 11502-1/2 Samsung Blvd?
The latest filing (City of Austin case 11604782, October 28, 2017) covers pioneer crossing east section 4b.
How many permits and filings does 11502-1/2 Samsung Blvd have?
1 filing across 1 project, from October 28, 2017 to October 28, 2017.
Is there other construction near 11502-1/2 Samsung Blvd?
Yes. Nearby filings include 11504 Church Canyon Dr (excavte 15 trench to repair main drain line in yard, Oct 28, 2025); 11508 Church Canyon Dr (access by tunnel to repair failed drain piping, Feb 8, 2026); 3401 Long Voyage Dr (we will tunnel approximately 7 feet under the house and excavate approximately 5 feet in the yard to access and repair the separated sewer line. once the repair is complete we will perform a hydrostatic test to check the system for leaks and ensure there are no additional issues. the completed repair will be inspected by the city. after approval we will install a support pier for the house beam and backfill the tunnel and excavation area, Nov 10, 2026).
How do I get alerts for new permits at 11502-1/2 Samsung Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11504 Church Canyon DrOct 28, 2025Excavte 15 trench to repair main drain line in yard · 29 m away
- 11508 Church Canyon DrFeb 8, 2026Access by tunnel to repair failed drain piping · 33 m away
- 3401 Long Voyage DrNov 10, 2026We will tunnel approximately 7 feet under the house and excavate approximately 5 feet in the yard to access and repair the separated sewer line. once the repair is complete we will perform a hydrostatic test to check the system for leaks and ensure there are no additional issues. the completed repair will be inspected by the city. after approval we will install a support pier for the house beam and backfill the tunnel and excavation area · 46 m away
- 11516 Church Canyon DrJan 8, 2026Excavate 7 tunnel to repair main drain line under house · 52 m away
- 11520 Church Canyon DrMay 8, 2026Gas off for an extended amount of time gas company required city inspection and gas test · 63 m away
- 11412 Church Canyon DrJan 28, 2026Natural gas water heater replacement · 64 m away
- 11509 Church Canyon DrApr 4, 2025Emergency main panel replacement no meter can · 75 m away
- 11524 Church Canyon DrMar 3, 2026Excavation of a 20-foot tunnel to reveal breaks in the drainage line. the excavation will expose a break near the cleanout an additional break on the main drainage line and a break on the upstairs drop-down · 76 m away
- 11505 Church Canyon DrAug 6, 2026Express: foundation repair · 76 m away
- 11513 Church Canyon DrMar 17, 2026Express: foundation repair · 77 m away
- 11501 Church Canyon DrSep 28, 2026Tunnel to repair broken pipe under foundation · 80 m away
- 3313 Savage Springs DrSep 12, 2024Replacement of mini-split system · 80 m away