11610 Winterborne Ct
Austin, TX 78754
11610 Winterborne Ct: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11610 Winterborne Ct, Austin, TX 78754. The most recent, filed April 29, 2024, covers: “Excavate 20 tunnel to repair main line under the house-no branches will be dug”.
Compiled from City of Austin records · updated Apr 29, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 29, 2024
- since Apr 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 20 tunnel to repair main line under the house-no branches will be dug
- AppliedApr 26, 2024
- IssuedApr 29, 2024
- WorkApr '24 – Jan '25
- Final inspectionJan 22, 2025
Passed final inspection Jan 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExcavate 20 tunnel to repair main line under the house-no branches will be dug
Excavate 20 tunnel to repair main line under the house-no branches will be dug
City of Austin permitPlumbing PermitFinal- Record
- 2024-052420 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-124807 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11610 Winterborne Ct
What is being built at 11610 Winterborne Ct?
The latest filing (City of Austin permit 2024-052420 PP, April 29, 2024) covers excavate 20 tunnel to repair main line under the house-no branches will be dug.
How many permits and filings does 11610 Winterborne Ct have?
2 filings across 2 projects, from April 29, 2024 to April 29, 2024.
Is there other construction near 11610 Winterborne Ct?
Yes. Nearby filings include 11501 Loweswater Ln (replacement of complete existing central heat and air system with or without duct work, Mar 20, 2024); 11619 Loweswater Ln (replacement of an existing water heater replace 65-gal hybrid electric water heater location: garage, Dec 19, 2025); 11612 Loweswater Ln (replacement of complete existing central heat and air system with or without duct work, Jun 28, 2024).
How do I get alerts for new permits at 11610 Winterborne Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11501 Loweswater LnMar 20, 2024Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 11619 Loweswater LnDec 19, 2025Replacement of an existing water heater replace 65-gal hybrid electric water heater location: garage · 57 m away
- 11612 Loweswater LnJun 28, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 11608 Loweswater LnAug 10, 2026Tunnel under the slab and replace all rough in cast iron pipes with new pvc pipes due to damaged cast iron pipes. replacing approximately 100 feet of pipe. the tunnel has two access holes. one on the left side front of the house by the clean out. the second one by the right side of the house close to kitchen · 83 m away
- 11616 Loweswater LnApr 8, 2025Replacement of building drain underneath the home · 89 m away
- 11521 Loweswater LnMar 9, 2026Replacing 4 windows like for like · 91 m away
- 11606 Loweswater LnJan 6, 2025Express: 17 push piers · 92 m away
- 11604 Loweswater LnFeb 7, 2025Customer needs to install new 200a service. the house was vandalized some time back and there is no panel or meter/can. need to pull new wire and install complete 200a service · 97 m away
- 11500 Loweswater LnJul 30, 202525 foot tunnel as well as fixing cleanout that is broken on the outside · 98 m away
- 11700 Rydalwater LnOct 31, 2025Replacement of an existing water heater installing like/like g water heater · 102 m away
- 11504 Loweswater LnJul 16, 2026Tunnel under slab to perform a whole hole sewer repipe underneath. we will be removing all cast iron and installing sch 40 pvc. tunnel access will be at the front corner of home near homeowner cleanout · 102 m away
- 11704 Rydalwater LnOct 16, 2024Tunnel to repair drainage system *** we are repairing 3 breaks under the master bathroom 2 on the mainline for the master bathroom about 20 feet from the outside wall on the master bathroom and one break that is near the outside wall. all breaks should be under the master bathroom or relatively close. the initial plan is to perform spot repairs · 103 m away