12100 Samsung Blvd

Austin, TX 78754 · Sas Fire Water Pump Building - Diesel Generator, Sas Gcs Capa-Up - Tior06 & Tior10 Demo + 36 more

Generator support work and equipment upgrades at industrial center

A concrete maintenance-access pad and offload containment for a diesel generator are the latest registered work at this multi-tenant industrial center, filed October 28, 2026. Other records indicate equipment changes inside manufacturing facilities, including installations and demolitions. A site plan for a parking garage was approved and released on July 13, 2026.

Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Oct 28, 2026

Projects
103
103 filings
Latest filing
Oct 28, 2026
since Mar 2, 2007
Largest scope
1,315,000 sf
Estimated cost
$38M
state registration

Where this project stands

In state plan review

SAS Fire Water Pump Building - Diesel Generator

4,000 sq ft · $350K est.

  1. RegisteredOct 28, 2026
  2. Plan reviewnow
  3. ConstructionMay '27 – Aug '27
  4. Inspected
  5. Closed

Construction is scheduled to start May 24, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 3 phone numbers

Permit & project history

103 projects
  1. Installation of a concrete maintenance access platform pad for a diesel generator and associated offload containment to support the fire water pump building. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationProject Registered4,000 sq ft$350K est.
    Tenant / owner
    Sas Fire Water Pump Building - Diesel Generator
    Design firm
    Pro
    Contact
    Pro
  2. Demolition and replacement of heat gen fan h, its damper, and associated ductwork. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationProject Registered20,000 sq ft$1.7M est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro
  3. Demolition of idle gcs gas equipment (dtlrs), three (3) offline htb dtlrs, two (2) octane dtlrs, located f2m1 csf col. j22-k22. 1. as-htb-01d-d, 2. as-htb-02d-d, 3.as-htb-03d-d, 4. as-octane-01d-d, 5.as-octane-02d-d — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete500 sq ft$300K est.
    Tenant / owner
    Sas Gcs Capa-Up - Tior06 & Tior10 Demo
    Design firm
    Pro
    Contact
    Pro
  4. Install fab1 icpms in the fab1 acid room (c9) and all necessary utilities, install hf(49%) remote sampling cabinet in fab1 acid room (c9) — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete3,098 sq ft$810K est.
    Tenant / owner
    Sas 2026 Capital Projects - Fab1 Icpms
    Design firm
    Pro
    Contact
    Pro
  5. Interior remodel existing light manufacturing facility - fab1 tmah replacement - f126-ch01

    Interior remodel existing light manufacturing facility - fab1 tmah replacement - f126-ch01

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Qty x2 new wf6 gas cabinets in the fab 2 fsf east bunker to support qty x1 new metals (snnr04) install qty (4) teos dtlrs, qty (1) teos lvmb for new tior06 + tior10 tools. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete800 sq ft$1.7M est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro
  7. F1 esc784(3%) blender and distribution install, acuplane blender and distribution loop install. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete2,070 sq ft$1.7M est.
    Tenant / owner
    Sas Fab1 Chemical Blenders
    Design firm
    Pro
    Contact
    Pro
  8. Installation of new f1-tmah (2.38%)-c12-01d-p, and new tmah(2.38%) storage tank. installation of new distribution : (4) t-boxes, (6) vmbs. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete3,000 sq ft$1.8M est.
    Tenant / owner
    Sas Fab1 Tmah Replacement
    Design firm
    Pro
    Contact
    Pro
  9. Installation of new slurry blender and distribution loops. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete1,100 sq ft$2.5M est.
    Tenant / owner
    Sas Fab2 Slurry Blender
    Design firm
    Pro
    Contact
    Pro
  10. Samsung Austin Semiconductor Parking Garage

    Samsung austin semiconductor parking garage

    City of Austin casesite_planApproved and Released
    Record
    13182510
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Demolish equipment one (1) dtlr to make space for new equipment and new tool in fab 1 csf. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete4,900 sq ft$150K est.
    Tenant / owner
    Sas Gcs Capa Up Demo F126-Sg01
    Design firm
    Pro
    Contact
    Pro
  12. Demolition of idle slurry equipment and distribution loops in fab1 slurry and unused vmb f1-esc784-f6-01v-w in fab1 csf — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete1,660 sq ft$800K est.
    Tenant / owner
    Sas Fab1 Slurry Blender Demo
    Design firm
    Pro
    Contact
    Pro
  13. Move-in and set eight (8) new teos dtlrs, one (1) lvmb, one (1) transfer line from as-teos-01mbcd-c-04, located f2m1 csf col. f20 — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete13,125 sq ft$1.7M est.
    Tenant / owner
    Sas Gcs Capa Up Install F226-Sg03
    Design firm
    Pro
    Contact
    Pro
  14. Install new remote ev controller for s-c4f6-205a/b-e heater blankets and install + wire new heater blankets compatible with remote ev controller for s-c4f6-205a/b-e — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete1,068 sq ft$161K est.
    Tenant / owner
    Sas Gcs Capa Up Install F226-Sg04
    Design firm
    Pro
    Contact
    Pro
  15. Install qty x2 new wf6 gas cabinets in the fab2 fsf east bunker to support qty x1 new metals (snnr02) tool for 14k lpv — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete856 sq ft$645K est.
    Tenant / owner
    Sas Gcs Capa Up Install F226-Sg05
    Design firm
    Pro
    Contact
    Pro
  16. Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Demolition of idle gcs equipment's *dtlrs), 10 offline teos dtlrs, located f2m1 csf col.f20. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete13,621 sq ft$400K est.
    Tenant / owner
    Sas Gcs Capa Up Demo F226-Sg01
    Design firm
    Pro
    Contact
    Pro
  18. Demolition of 7 idle gvs gas equipment located f2m2 csf, near columns g2-h2 and e5-h5. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete6,734 sq ft$442K est.
    Tenant / owner
    Sas Gcs Capa Up Demo F226-Sg02
    Design firm
    Pro
    Contact
    Pro
  19. Design and installation of (1) t-box and (1) vmb within the fab2 csf to expand the existing tmah(2.38%) distribution in fab2. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete2,000 sq ft$630K est.
    Tenant / owner
    Sas Fab2 Clns Tmah Conversion
    Design firm
    Pro
    Contact
    Pro
  20. Scope consists of issuing ifc set and providing ca for a permanent swing tank within a new containment area connected to the original fab1 fww and aww transfer tank containment. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationReview Complete3,750 sq ft$12M est.
    Tenant / owner
    Sas Fab1 Waste Tank Expansion
    Design firm
    Pro
    Contact
    Pro
  21. Installation of (1) new sif4 gas cabinet within the fab2 corrosive/oxidizer room and (1) new vmb within the fab2 csf area. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationProject Closed3,207 sq ft$3.8M est.
    Tenant / owner
    Sas Fab2 Sif4 Distribution
    Design firm
    Pro
    Contact
    Pro
  22. Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Installation for a new cuso4 tank within the fab1 crs room. the new tank will be installed on top of existing containment trench grating. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationProject Closed1,215 sq ft$280K est.
    Tenant / owner
    Sas Fab1 Cuso4 Tank Replacement
    Design firm
    Pro
    Contact
    Pro
  24. Construction of steel canopies over approximately 1112 existing parking spaces. (reactivated after revision expanded the scope of project)

    Construction of steel canopies over approximately 1112 existing parking spaces. (reactivated after revision expanded the scope of project)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Replacement of existing boilers deaerator combustion air system; building footprint remains unchanged

    Replacement of existing boilers deaerator combustion air system; building footprint remains unchanged

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  26. Replacement of cub1 non-heated air dryers and conditioning of cub1 compressor room; building footprint remains unchanged

    Replacement of cub1 non-heated air dryers and conditioning of cub1 compressor room; building footprint remains unchanged

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  27. Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  28. Expand mechanical room at existing semiconductor manufacturing

    Expand mechanical room at existing semiconductor manufacturing

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  29. Expand mechanical room at existing semiconductor manufacturing

    Expand mechanical room at existing semiconductor manufacturing

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  30. Expand waste tank room at existing semiconductor manufacturing

    Expand waste tank room at existing semiconductor manufacturing

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  31. Expand waste tank room at existing semiconductor manufacturing

    Expand waste tank room at existing semiconductor manufacturing

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  32. Expand mechanical room at existing semiconductor manufacturing

    Expand mechanical room at existing semiconductor manufacturing

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  33. Expand mechanical room at existing semiconductor manufacturing

    Expand mechanical room at existing semiconductor manufacturing

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  34. Expand waste tank room at existing semiconductor manufacturing

    Expand waste tank room at existing semiconductor manufacturing

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  35. Expand waste tank room at existing semiconductor manufacturing

    Expand waste tank room at existing semiconductor manufacturing

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  36. Temporary building permit-scope of permit is limited to foundation slab on grade and underground utilities for pr 2024-093191

    Temporary building permit-scope of permit is limited to foundation slab on grade and underground utilities for pr 2024-093191

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  37. New canopy photometrics plan - west yard photometrics plan - installing 11 new lights poles

    New canopy photometrics plan - west yard photometrics plan - installing 11 new lights poles

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  38. Installation of (2) wf6 gas cabinets and associated piping within the fab2 fsf gas bunker. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationInspection Complete250 sq ft$600K est.
    Tenant / owner
    Sas Fab2 Teos Infrastructure - Phase 2
    Design firm
    Pro
    Contact
    Pro
  39. Installation of (2) teos dtlrs and associated piping within the fab2 csf. — samsung austin semiconductor

    TDLR project registrationNew ConstructionInspection Complete150 sq ft$1.2M est.
    Tenant / owner
    Sas Fab2 Teos Infrastructure - Phase 1
    Design firm
    Pro
    Contact
    Pro
  40. Demolition of (2) teos dtlrs and (1) teos vmb and associated piping within the fab2 csf. — samsung austin semiconductor

    TDLR project registrationRenovation/AlterationInspection Complete145 sq ft$500K est.
    Tenant / owner
    Sas Fab2 Teos Demo Phase II
    Design firm
    Pro
    Contact
    Pro

+ 63 older projects. See the full history with a free trial.

Sources: Texas Department of Licensing and Regulation · City of Austin

Questions about 12100 Samsung Blvd

What is being built at 12100 Samsung Blvd?

The latest registration, dated October 28, 2026, describes a concrete maintenance-access pad and offload containment for a diesel generator supporting a fire-water pump building. It is listed as a renovation or alteration, not a new building.

When was the latest project filed at 12100 Samsung Blvd?

The latest listed registration is dated October 28, 2026. It is TDLR project TABS2027004602 for the SAS Fire Water Pump Building - Diesel Generator.

Is a parking garage planned at 12100 Samsung Blvd?

A City of Austin site plan for a Samsung Austin Semiconductor parking garage was approved and released on July 13, 2026. The record provided does not establish that construction has started.

What other construction work is happening at the industrial center?

Recent registrations include chemical and slurry blender installations, gas equipment demolition, and upgrades to manufacturing-facility systems. For example, a chemical blenders project was registered August 3, 2026, as TABS2026026745.

Is a new semiconductor fab being built at 12100 Samsung Blvd?

The records listed here describe alterations and equipment work inside existing manufacturing facilities, along with a parking garage site plan. They do not identify a new fab building.

What's being built near Torchy's Tacos on East Parmer Lane?

The 12100 Samsung Blvd records concern industrial-site work. Torchy's Tacos is about 427 meters away, at 3500 East Parmer Lane; its separate renovation and restaurant finish-out record was filed August 27, 2026.

Also being built nearby

All of 78754

More demolitions in 78754, warehouses & industrial in 78754, parking structures in 78754.