1609 Centre Creek Dr
Austin, TX 78754 · 1609 Centre Creek Ltd., C/O Live Oak
Three manager offices planned in 1609 Centre Creek remodel
An interior office renovation at 1609 Centre Creek Dr replaces open-area cubicles on the second floor with three manager offices. The project was registered with TDLR on May 15, 2024, and Austin building, electrical and mechanical permits were filed August 5, 12 and 13, 2024; all three permits are marked final.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Aug 13, 2024
- Projects
- 5
- 5 filings
- Latest filing
- Aug 13, 2024
- since Mar 2, 2007
- Largest scope
- 900 sf
- Estimated cost
- $180K
- state registration
Where this project stands
FinaledInterior remodel existing admin
- AppliedJun 10, 2024
- IssuedAug 13, 2024
- WorkAug '24 – Aug '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsInterior remodel existing admin
Interior remodel existing admin
City of Austin permitMechanical PermitFinal- Record
- 2024-083521 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel existing admin
Interior remodel existing admin
City of Austin permitElectrical PermitFinal- Record
- 2024-083521 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel existing admin
Interior remodel existing admin
City of Austin permitBuilding PermitFinal- Record
- 2024-083521 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacing existing workstation (cubicles) in open areas with three manager offices. — 1609 centre creek
TDLR project registrationRenovation/AlterationReview Complete900 sq ft$180K est.- Project #
- TABS2024018556
- Tenant / owner
- Office Renovation - 2nd Floor Manager Offices
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 1609 Centre Creek Dr
What is being built at 1609 Centre Creek Dr in Austin?
The project is an interior office renovation that replaces open-area cubicles on the second floor with three manager offices. The TDLR registration lists 900 square feet.
When were permits filed for the 1609 Centre Creek Dr office renovation?
Austin filed the building permit, 2024-083521 BP, on August 5, 2024; the electrical permit, 2024-083521 EP, on August 12; and the mechanical permit, 2024-083521 MP, on August 13. Each is marked final.
How many offices are planned at 1609 Centre Creek Dr?
The TDLR project registration describes replacing existing cubicles with three manager offices on the second floor.
What is the estimated cost of the 1609 Centre Creek Dr renovation?
The TDLR registration lists an applicant-estimated project cost of $180,000.
What's being renovated near Kfg Cameron Center on Cameron Road?
At 1609 Centre Creek Dr, about 412 meters from Kfg Cameron Center at 8200 Cameron Road, permits indicate an interior office remodel. The registered scope describes three second-floor manager offices.
Is 1609 Centre Creek Dr a new office building?
The records describe an interior remodel of an existing administrative office, not a new building. The related Austin permits were filed in August 2024 and are marked final.
Also being built nearby
All of 78754- 1700 Rutherford LnMar 2, 2007Parking addition for american heart association · 111 m away
- 1601 Rutherford LnJul 20, 2026Emergency permit to replace stolen conductors. disconnect/reconnect service to perform work · 178 m away
- 1705 Centre Creek DrFeb 25, 2026Vandals gutted the electrical distribution system. all panel busses were stolen and cabinets damaged. need to replace panels disconnects feeders and disconnects. some wiring at panels will need to be extended and replaced as well. attached is a one line of what needs to be replaced · 189 m away
- 1631 Headway CirApr 24, 2016Kinnarps office/showroom · 194 m away
- 8000 Centre Park DrFeb 6, 2024Replacing fixtures in tenant spaces on 1st floor units 100112130150160165 170 to led 1-for 1 this is part of austin energy rebate · 198 m away
- 1616 Headway CirMay 26, 2025Add door and push button lock to prevent access without an escort. (floor 1) · 246 m away
- 8013 Centre Park DrJan 21, 2026Pecu centre park sign a · 268 m away
- 7900 Centre Park DrMar 2, 2007T.m.e.a. office building · 275 m away
- 1616 Headway Circle · Schonhoff Family Trust C/O Kpg CommercialOct 29, 202415029.01 headway tdcj remodel — renovation/alteration — interior remodel of an existing 2nd floor office space, full demolition of interior elements except stairs, elevator, core restrooms and server room. new walls, doors, ceilings, mep systems · 299 m away
- 8001 Centre Park DrFeb 13, 2024Tenant finish out - office space · 300 m away
- 1520 Rutherford LnFeb 6, 2025Replace existing chiller and related piping · 309 m away
- 7901 Centre Park DrFeb 13, 2009Peace palaces · 333 m away
More offices in 78754.