1624 Rundberg Ln
Austin, TX 78754
Cameron Crossing 1 site plan approved in Austin
A City of Austin site plan for Cameron Crossing 1 at 1624 Rundberg Ln was approved and released on October 9, 2026. The records do not specify the project’s building type, size, or use. Earlier site plan cases for Cameron Crossing I were withdrawn in 2020 and expired in 2022.
Summarized from City of Austin records · updated Oct 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 9, 2026
- since Apr 8, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 1624 Rundberg Ln
What is being built at 1624 Rundberg Ln in Austin?
City records show an approved and released site plan case named Cameron Crossing 1. The records do not specify the type or size of development.
Was the Cameron Crossing 1 site plan approved?
Yes. The City of Austin case was approved and released on October 9, 2026 (case 12787352).
When was the site plan for Cameron Crossing 1 filed?
The latest case was filed on October 9, 2026. Earlier cases were filed on April 8, 2020, and January 21, 2022.
What happened to the earlier Cameron Crossing I cases?
The 2020 site plan case (12133951) was withdrawn, and the 2022 case (12451152) expired. A later case, Cameron Crossing 1 (12787352), was approved and released in 2026.
What is planned near The Padel Collective on Rundberg Lane?
A site plan for Cameron Crossing 1 was approved and released at 1624 Rundberg Ln, about 214 meters from The Padel Collective at 1610 Dungan Lane. The available record does not describe the planned development in more detail.
What is planned near White Water Express on Cameron Road?
The Cameron Crossing 1 site plan at 1624 Rundberg Ln was approved and released on October 9, 2026. White Water Express at 9313 Cameron Road is about 222 meters away.
Also being built nearby
All of 78754- 1520 Rundberg LnAug 1, 2022Quiktrip # 4145 (with r sp-2018-0368c) · 134 m away
- 9200 Brown LnMay 26, 2012Commercial square subdivision · 144 m away
- 9405 Dessau RdDec 2, 2013Weigh n pay recycle center · 173 m away
- 9309 Cameron RdAug 23, 2024Cornerstone church · 174 m away
- 9313 Cameron RdOct 7, 2026Approximately 120 lf of 2 poly domestic water line from existing meter to 5 ft outside finished slab and approximately 168 lf of 6 sdr26 sewer with (1) 6 two-way cleanout and (1) 6 single cleanouts from existing cleanout to 5 ft outside finished slab · 177 m away
- 1611-3/4 Dungan LnFeb 26, 2015El navegante night club (resubmittal of spc-02-0014a) · 198 m away
- 1615 Dungan LnMar 2, 2007The box worx · 198 m away
- 9401 Dessau Rd · Qt South, LLCOct 2, 2026East rundberg lane extension construction plans · 200 m away
- 9207 Cameron RdApr 7, 2020Cameron commercial · 213 m away
- 9201 Cameron RdJan 21, 2022Bridge at cameron (with r sp-2016-0250c.sh) · 214 m away
- 1610 Dungan Lane · Marj Real Estate Investments LLCNov 25, 2025The padel collective — renovation/alteration — interior ti in an existing shell for a padel and wellness facility. scope includes 5 courts, reception, micro-gym, office, lounges, locker rooms, grab-n-go, and a small patio. limited structural slab prep and minor storefront work · 214 m away
- 1515 Dungan LnDec 5, 2008Calhoon's corner too — calhoon's corner, too · 215 m away