3217 Long Day Dr
Austin, TX 78754
Permit filed for central heating and air replacement
A City of Austin mechanical permit records replacement of the existing central heating and air system at 3217 Long Day Dr, with or without duct work. The permit, 2025-128894 MP, was filed on October 10, 2025, and is listed as final.
Summarized from City of Austin records · updated Oct 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 10, 2025
- since Oct 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 6, 2025
- IssuedOct 10, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 17, 2025
Passed final inspection Oct 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-128894 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3217 Long Day Dr
What work is being done at 3217 Long Day Dr?
A City of Austin permit records replacement of the existing central heating and air system, with or without duct work. The permit is listed as final.
When was the permit for 3217 Long Day Dr filed?
The mechanical permit was filed on October 10, 2025.
What is the permit number for 3217 Long Day Dr?
The permit number is 2025-128894 MP. It is a City of Austin mechanical permit filed October 10, 2025.
Is a new building being built at 3217 Long Day Dr?
The record describes replacement of an existing central heating and air system, not construction of a new building.
Does the permit for 3217 Long Day Dr include duct work?
The description says the system replacement may include duct work; it does not specify whether duct work is included.
What is the status of the 3217 Long Day Dr permit?
The City of Austin lists mechanical permit 2025-128894 MP as final.
Also being built nearby
All of 78754- 11000 Liberty Farms DrMar 2, 2007Pioneer crossing east section 7 — pioneer crossing east section 7 · 44 m away
- 11001 Liberty Farms DrJun 23, 2025Electrical panel repair · 59 m away
- 3201 Long Day DrMar 3, 2025Replacement of an existing water heater water heater replacement like for like · 62 m away
- 11009 Boundless Valley DrJun 27, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 11013 Boundless Valley DrApr 5, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 11012 Boundless Valley DrJan 24, 2024Replacement of an existing water heater · 132 m away
- 11024 Liberty Farms DrMay 3, 2024Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 11025 Boundless Valley DrJan 19, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 11016 Boundless Valley DrFeb 9, 2024Tunnel 12ft under home to guest bath to make repairs on sewer system. we will remove all current drains and replace with sch 40 pvc making connections with code approved mission bands. pipe will hung with uni strut and anchored every 4ft. replace clean out · 144 m away
- 3308 Long Day DrMar 29, 2024Replacement of an existing water heater · 152 m away
- 11020 Boundless Valley DrOct 16, 202611 tunnel to repair break in building drain system · 156 m away
- 11024 Boundless Valley DrMar 3, 2026Tunnel for drain system repair (preferred): diagnostic revealed a broken 3 wye for the powder bathroom. the wye is located under the utility room. there is also a complete break inside of the wall behind the powder bathroom sink. there is another break on the sewer cleanout for the upstairs bathroom. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole at the sewer exit of the house. - then we tunnel underneath the foundation of the house approximately 7 feet to access and expose noted diagnostic issues · 169 m away