4811 Virginia Dare Ln
Austin, TX 78754
4811 Virginia Dare Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 4811 Virginia Dare Ln, Austin, TX 78754. The most recent, filed September 4, 2025, covers: “This project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground”.
Compiled from City of Austin records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledThis project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground
- AppliedAug 27, 2025
- IssuedSep 4, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 16, 2025
Passed final inspection Sep 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectThis project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground
This project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground
City of Austin permitElectrical PermitFinal- Record
- 2025-109084 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4811 Virginia Dare Ln
What is being built at 4811 Virginia Dare Ln?
The latest filing (City of Austin permit 2025-109084 EP, September 4, 2025) covers this project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground.
How many permits and filings does 4811 Virginia Dare Ln have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 4811 Virginia Dare Ln?
Yes. Nearby filings include 4810 Valcour (: install a new meter and expansion coupling for underground service. the foundation is shifting and causing the conduit to pull the meter off the wall. this will prevent the meter from coming off again and pulling the panel down as well, Nov 6, 2024); 4807 Fort Moultrie Ln (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 9201 Magna Carta Loop (excavate 20 trench to repair main drain line in yard, Sep 17, 2025).
How do I get alerts for new permits at 4811 Virginia Dare Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 4810 ValcourNov 6, 2024: install a new meter and expansion coupling for underground service. the foundation is shifting and causing the conduit to pull the meter off the wall. this will prevent the meter from coming off again and pulling the panel down as well · 57 m away
- 4807 Fort Moultrie LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 83 m away
- 9201 Magna Carta LoopSep 17, 2025Excavate 20 trench to repair main drain line in yard · 173 m away
- 9108 Magna Carta LoopSep 16, 2024Remove and replace 18 feet of sewer line · 178 m away
- 4704 Dorchester Heights LnOct 27, 2026Replacement of an existing water heater 50 gallon water heater change out 4704 dorchester heights lane austin tx 78754 · 232 m away
- 4707 Lake Champlain LnSep 8, 2025Excavate 35 tunnel to repair main drain line under house · 249 m away
- 9501 Springdale RdMar 2, 2007Springdale heights · 315 m away
- 5200 Coppermead LnSep 21, 2026Main water line repair · 351 m away
- 5206 Coppermead LnJul 30, 2025Replacement of an existing water heater 40gal gas · 356 m away
- 9506 Springdale RdJul 15, 2024Installing circuit for ev charging · 365 m away
- 9206 Wellesley DrOct 28, 2024Tunnel to be dug under home to fix broken main sewer line · 366 m away
- 9504 Springdale RdSep 29, 2025Upgrade meter box and adding means of disconnect · 365 m away