6405 Boyce Ln
Austin, TX 78754
6405 Boyce Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 6405 Boyce Ln, Austin, TX 78754. The most recent, filed October 24, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 3 ton gas system replacement”.
Compiled from City of Austin records · updated Oct 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 24, 2025
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 3 ton gas system replacement
- AppliedOct 6, 2025
- IssuedOct 24, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 19, 2025
Passed final inspection Dec 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 3 ton gas system replacement
Replacement of complete existing central heat and air system with or without duct work 3 ton gas system replacement
City of Austin permitMechanical PermitFinal- Record
- 2025-128971 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6405 Boyce Ln
What is being built at 6405 Boyce Ln?
The latest filing (City of Austin permit 2025-128971 MP, October 24, 2025) covers replacement of complete existing central heat and air system with or without duct work 3 ton gas system replacement.
How many permits and filings does 6405 Boyce Ln have?
1 filing across 1 project, from October 24, 2025 to October 24, 2025.
Is there other construction near 6405 Boyce Ln?
Yes. Nearby filings include 6413 Boyce Ln (replacement of an existing water heater, Nov 8, 2024); 6417 Boyce Ln (replacement of complete existing central heat and air system with or without duct work, Jun 14, 2024); 11909 Kilmartin Ln (47ft tunnel under slab with 20ft sewer line repair we will be using 4-inch pvc. there is one access hole located on the right corner of the property by the clean out. the work starts at the clean out goes toward the back of the home and follows the mainline, Jan 23, 2025).
How do I get alerts for new permits at 6405 Boyce Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 6413 Boyce LnNov 8, 2024Replacement of an existing water heater · 31 m away
- 6417 Boyce LnJun 14, 2024Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 11909 Kilmartin LnJan 23, 202547ft tunnel under slab with 20ft sewer line repair we will be using 4-inch pvc. there is one access hole located on the right corner of the property by the clean out. the work starts at the clean out goes toward the back of the home and follows the mainline · 62 m away
- 6509 Boyce LnApr 24, 2024Performed gas pressure test needs inspection · 94 m away
- 11924 Kilmartin LnApr 16, 2026Express: foundation repair - install 10 push piers · 103 m away
- 11928 Kilmartin LnApr 29, 2026Gomez - 39-50837 - install new/additional 5.76 kw rooftop solar system to existing residential only using line side tap. utility company - bluebonnet · 118 m away
- 6504 Boyce LnAug 15, 2025The park at speyside phase 2 · 137 m away
- 12005 Kilmartin LnSep 24, 2025Express: foundation repair (14 push piers) · 151 m away
- 12116 Innes View RdJan 28, 2025Replacement of an existing water heater replace 40 gallon natural gas water heater · 161 m away
- 12204 Innes View RdMay 14, 202630 tunnel below the foundation to repair the kitchen/utility drain line. 1 access hole back · 174 m away
- 12225 Innes View RdNov 17, 2025Replacement of an existing water heater keith cawood - replacement of 40 gal natural gas wh in closet · 177 m away
- 12008 Kilmartin LnJun 8, 2026Express: foundation repair · 178 m away