6835 Thistle Hill Way
Austin, TX 78754
Foundation and bathroom plumbing repairs at 6835 Thistle Hill Way
City of Austin permits record foundation repair at the home on October 24, 2025, and a master bathroom plumbing repair involving five feet of tunneling on December 12, 2025. Both permits are marked final.
Summarized from City of Austin records · updated Dec 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 12, 2025
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel spot repair master bathroom. 5 feet of tunneling. access hole will be on the right side of the home
- AppliedDec 9, 2025
- IssuedDec 12, 2025
- WorkDec '25 – Mar '26
- Final inspectionMar 3, 2026
Passed final inspection Mar 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel spot repair master bathroom. 5 feet of tunneling. access hole will be on the right side of the home
Tunnel spot repair master bathroom. 5 feet of tunneling. access hole will be on the right side of the home
City of Austin permitPlumbing PermitFinal- Record
- 2025-156490 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-138048 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6835 Thistle Hill Way
What work was permitted at 6835 Thistle Hill Way?
Austin records show a foundation repair permit and a plumbing permit for a master bathroom tunnel spot repair. The permits were filed October 24 and December 12, 2025, respectively.
Was a new home permitted at 6835 Thistle Hill Way?
The records provided do not show a new-home permit. They list foundation repair and plumbing work at the address.
When was the foundation repair permitted at 6835 Thistle Hill Way?
The City of Austin issued permit 2025-138048 BP on October 24, 2025, for express foundation repair. Its status is listed as final.
What plumbing work is planned at 6835 Thistle Hill Way?
Permit 2025-156490 PP, dated December 12, 2025, describes a master bathroom tunnel spot repair involving five feet of tunneling. It says the access hole will be on the right side of the home.
Are the permits for 6835 Thistle Hill Way final?
Both listed City of Austin permits have a final status: the foundation repair permit filed October 24, 2025, and the plumbing permit filed December 12, 2025.
How many permits are listed for 6835 Thistle Hill Way?
The records show two City of Austin permits: one for foundation repair and one for a master bathroom plumbing repair.
Also being built nearby
All of 78754- 6838 Thistle Hill WayJan 27, 2025Express: foundation repair- installing 18 exterior pilings and 4 interior pilings · 54 m away
- 6850 Thistle Hill WayJun 3, 2026Express: foundation repair · 76 m away
- 6859 Thistle Hill WayMar 28, 2024New construction of 383 sq ft in-ground pool and 49 sq ft spa with reqd enclosure device · 84 m away
- 6908 Celtic CtMay 21, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3.5 ton single stage goodman system · 89 m away
- 6858 Thistle Hill WayJun 16, 2025We will need to tunnel 22 feet from the right side of the kitchen area to expose the fractured washing machine 90. we will then need to make repairs in the area. after the repairs are complete we will perform a hydrostatic test to ensure the quality of our work · 103 m away
- 6908 Tam CtDec 20, 2024Replacement of an existing water heater · 114 m away
- 6909 Celtic CtJan 28, 2026Express - foundation repair - installing 18 exterior & 3 interior pilings · 117 m away
- 6867 Thistle Hill WayNov 19, 2024Gas line for generator (above ground) · 125 m away
- 11403 Ashprington CvSep 23, 2024Express: foundation repair · 128 m away
- 6916 Celtic CtOct 19, 2026Express: foundation repair · 130 m away
- 7029 Thistle Hill WayAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 7045 Thistle Hill WayOct 23, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2.5 ton horizontal gas · 150 m away