7008 William Wallace Way
Austin, TX 78754
7008 William Wallace Way: 3 projects on record
City of Austin lists 3 filings across 3 projects at 7008 William Wallace Way, Austin, TX 78754 since March 26, 2025. The most recent, filed April 2, 2025, covers: “Express: ramp at back door”.
Compiled from City of Austin records · updated Apr 2, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Apr 2, 2025
- since Mar 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: ramp at back door
- AppliedApr 2, 2025
- IssuedApr 2, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 10, 2025
Passed final inspection Apr 10, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsExpress: ramp at back door
Express: ramp at back door
City of Austin permitBuilding PermitFinal- Record
- 2025-039201 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: tub to shower conversion replace 2 toilets replace water heater
Express: tub to shower conversion replace 2 toilets replace water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-029467 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: tub to shower conversion replace 2 toilets replace water heater
Express: tub to shower conversion replace 2 toilets replace water heater
City of Austin permitBuilding PermitFinal- Record
- 2025-029467 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7008 William Wallace Way
What is being built at 7008 William Wallace Way?
The latest filing (City of Austin permit 2025-039201 BP, April 2, 2025) covers express: ramp at back door.
How many permits and filings does 7008 William Wallace Way have?
3 filings across 3 projects, from March 26, 2025 to April 2, 2025.
Is there other construction near 7008 William Wallace Way?
Yes. Nearby filings include 7004 William Wallace Way (water yard line from meter to home roughly 80ft, Feb 16, 2024); 7018 William Wallace Way (install evse, Sep 15, 2025); 7000 William Wallace Way (replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace old systems with new 3 ton and 5 ton gas systems goodman systems, May 21, 2025).
How do I get alerts for new permits at 7008 William Wallace Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 7004 William Wallace WayFeb 16, 2024Water yard line from meter to home roughly 80ft · 19 m away
- 7018 William Wallace WaySep 15, 2025Install evse · 29 m away
- 7000 William Wallace WayMay 21, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace old systems with new 3 ton and 5 ton gas systems goodman systems · 39 m away
- 7017 William Wallace WaySep 3, 2025Under slab repair to repair drain line tunneling 6ft under to repair broken drain line emergency repair as no service to toilets main service back up 9/3/2025 · 58 m away
- 7005 William Wallace WayFeb 18, 2026Express: foundation repair - install 18 push piers · 60 m away
- 7021 William Wallace WayFeb 6, 2025Replacement of an existing water heater replace 40g gas water heater with new 40g gas water heater · 69 m away
- 6916 William Wallace WayJun 30, 2025Excavate 45 tunnel to repair main drain line under house serving one bathroom · 76 m away
- 6908 William Wallace WayJun 11, 2024Express: foundation repair · 113 m away
- 6904 William Wallace WayOct 14, 2026Express: foundation repair - installing 17 steel hybrid piers2 exterior breakouts2 garage breakouts · 130 m away
- 11521 St Merryn RdApr 9, 2009Harris branch ph. 1-d, sec. 4 — harris branch ph. 1-d, sec. 4 · 150 m away
- 11720 Reindeer DrAug 12, 2025Install new roof-mounted solar system energy storage system with tesla backup switch and ev wall connector to existing residence. bluebonnet · 162 m away
- 6838 William Wallace WayAug 27, 2026After we excavated the sewer line we found a break on both sides of the beam. so the faulty piece of pipe was cut out. we installed a new piece of pipe with underground rated bands and a hanger for support · 166 m away