7201 Curpin Cv
Austin, TX 78754
Foundation repair permitted at 7201 Curpin Cv
A foundation repair at 7201 Curpin Cv was permitted on January 28, 2026. The permit describes installing 33 press piling piers—28 around the perimeter and five inside—and patching nine breakthrough locations.
Summarized from City of Austin records · updated Jan 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2026
- since Jan 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - foundation repair on slab foundation. intend to install 33 total press piling piers including 28perimeter and 5 interior locations. there will be 9 breakthrough and patched locations
- AppliedJan 23, 2026
- IssuedJan 28, 2026
- WorkJan '26 – Apr '26
- Final inspectionApr 14, 2026
Passed final inspection Apr 14, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress - foundation repair on slab foundation. intend to install 33 total press piling piers including 28perimeter and 5 interior locations. there will be 9 breakthrough and patched locations
Express - foundation repair on slab foundation. intend to install 33 total press piling piers including 28perimeter and 5 interior locations. there will be 9 breakthrough and patched locations
City of Austin permitBuilding PermitFinal- Record
- 2026-008668 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7201 Curpin Cv
What is being built at 7201 Curpin Cv?
The City of Austin permit describes foundation repair, not a new building. The work includes installing 33 press piling piers.
When was the foundation repair at 7201 Curpin Cv permitted?
The permit was filed on January 28, 2026. It is permit 2026-008668 BP.
How many piers are included in the 7201 Curpin Cv permit?
The permit calls for 33 press piling piers: 28 perimeter piers and five interior piers.
Does the work at 7201 Curpin Cv include interior foundation repairs?
Yes. The permit specifies five interior pier locations, in addition to 28 perimeter locations.
What does the 7201 Curpin Cv foundation repair permit include?
It includes installing 33 press piling piers and patching nine breakthrough locations. The City of Austin permit is listed as final.
Also being built nearby
All of 78754- 7209 Curpin CvMay 20, 2025Replacement of an existing water heater replacing 40al gas water heater · 59 m away
- 7204 Curpin CvMay 30, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 11105 Avering LnMar 18, 2026Replacement of an existing water heater 40 gallon water heater change out 11105 avering lane austin tx 78754 · 99 m away
- 11003 Harris Branch PkwyMar 2, 2007Harris branch general store · 106 m away
- 11100 Amaranth LnJun 26, 2025Plumbing repipe under the slab · 126 m away
- 11113 Avering LnAug 27, 2026Sewer rebuild. spot repair up to 5ft · 129 m away
- 11100 Avering LnNov 13, 2025Express: install 19 push piers · 145 m away
- 11112 Avering LnSep 29, 2025Whole house repipe there will be minor sheetrock cutting to gain access to fixtures like the washer box and shower valves. it will be like for like. no tunneling involved · 162 m away
- 11125 Avering LnDec 8, 2025Express- replace 2 tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 196 m away
- 7400 Blue Goose RdNov 18, 2015Evergreen · 203 m away
- 11118 Seay StJan 19, 2024Express: foundation repair (14 exterior pilings 12 interior pilings adjust 15 exterior pilings) · 204 m away
- 11112 Amaranth LnDec 12, 2025Whole home water re-pipe · 205 m away