City of Austin records identify an existing church at 8140 Exchange Dr. A building permit filed August 20, 2026, references work on the existing foundation; a plumbing permit filed November 6, 2026, covers repairs to broken kitchen drains. The records do not describe a new building.

Summarized from City of Austin records · updated Nov 6, 2026

Projects
4
4 filings
Latest filing
Nov 6, 2026
since Mar 2, 2007
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Diagnostic revealed a broken 3 wye in the kitchen under the foundation. there is also another broken 4 wye at the exterior beam for the 3 compartment sink drain. plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - begin by prepping the interior of the kitchen with either plastic or cardboard to help protect from construction dust. then we will utilize specialized equipment to create a direct access entry hole located at the doorway into the kitchen. then we will tunnel remove the soil to expose the broken 3wye. if additional tunneling or beam penetration is needed a supplemented estimated will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - defective drains will be removed from plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance to plumbing code. then we will dig down at the exterior to expose the 4 wye and perform repairs

  1. AppliedOct 16, 2026
  2. IssuedNov 6, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
7% through of the permit windowNov 6, 2026 → May 5, 2027

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Diagnostic revealed a broken 3 wye in the kitchen under the foundation. there is also another broken 4 wye at the exterior beam for the 3 compartment sink drain. plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - begin by prepping the interior of the kitchen with either plastic or cardboard to help protect from construction dust. then we will utilize specialized equipment to create a direct access entry hole located at the doorway into the kitchen. then we will tunnel remove the soil to expose the broken 3wye. if additional tunneling or beam penetration is needed a supplemented estimated will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - defective drains will be removed from plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance to plumbing code. then we will dig down at the exterior to expose the 4 wye and perform repairs

    Diagnostic revealed a broken 3 wye in the kitchen under the foundation. there is also another broken 4 wye at the exterior beam for the 3 compartment sink drain. plan of action is to apply for a permit with the customers jurisdiction to legally and professional proceed with repairs. - begin by prepping the interior of the kitchen with either plastic or cardboard to help protect from construction dust. then we will utilize specialized equipment to create a direct access entry hole located at the doorway into the kitchen. then we will tunnel remove the soil to expose the broken 3wye. if additional tunneling or beam penetration is needed a supplemented estimated will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the time/material needed to complete the job. - defective drains will be removed from plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance to plumbing code. then we will dig down at the exterior to expose the 4 wye and perform repairs

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Existing foundation as per scope of work attached drawings. existing church

    Existing foundation as per scope of work attached drawings. existing church

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. HOME BUILDERS ASSOCIATIONS OF GREATER AUSTIN

    Home builders associations of greater austin

    City of Austin casesite_planApproved and Released
    Record
    237113
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8140 Exchange Dr

What is being built at 8140 Exchange Dr in Austin?

The records do not describe a new building. A City of Austin building permit filed August 20, 2026, references work on the existing foundation at an existing church.

What work is planned at 8140 Exchange Dr?

A plumbing permit filed November 6, 2026, describes repairing two broken kitchen drain connections and replacing them with PVC pipe and fittings.

Is a new church being built at 8140 Exchange Dr?

The permit record describes an existing church and work on its existing foundation. It does not indicate that a new church is being built.

Are kitchen drain repairs permitted at 8140 Exchange Dr?

Yes. City of Austin plumbing permit 2026-136737 PP, filed November 6, 2026, is active and describes repairs to broken drains in the kitchen.

What is happening near Energyx Phase 3 on Ridgepoint Drive?

At 8140 Exchange Dr, about 398 meters from Energyx Phase 3, City of Austin records show a permit for repairs to kitchen drains and a separate building permit referencing the existing church foundation.